Laserfiche WebLink
CIRCES Cost Estimatina Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task #: 252 <br />State : Colorado Permit/job# : C -1981 -038 <br />Date : 0810512010 <br />County : Delta Abbreviation : none <br />User: JRS <br />Site Bowie No. 1 Mine Filename : CO38 -252 <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action : Permit Revision 04 <br />Task description : Regrade Three Drill Pads - Credit <br />HOURLY EQUIPMENT COST <br />Basic machine Cat D9R - 9SU (2005) <br />Horsepower: <br />405 __ <br />Blade type Semi - Universal <br />Attachment no. 1 : ROPS Cab <br />Shift basis: <br />1 per day <br />Attachment no. 2: 3-shank ripper <br />Data source : <br />(CRG) <br />Utilization % <br />Cost Breakdown: <br />Ownership cost/hour : $67.77 NA <br />Operating cost/hour: $95.29 100 <br />Ripper op. cost/hour : $0.00 0 <br />Operator cost/hour : $38.54 NA <br />Total unit cost/hour : $201.60 Total fleet cost/hour : <br />$201.60 <br />MATERIAL QUANTITIES <br />Initial <br />Swell Loose <br />volume: 1,925 BCY <br />factor : 1.250 volume: <br />2,406 <br />LCY <br />Source of estimated <br />volume Division Estimate <br />Source of estimated swell factor CAT Handbook <br />HOURLY PRODUCTION <br />Job Condition Correction Factors <br />Source <br />Operator skill : <br />0.75 <br />(avg.) <br />Average push distance : <br />100 feet Material consistency: <br />0.90 <br />(Cat HS) <br />Unadjusted hourly production : <br />1,243.2 LCY /hr Dozing method: <br />1.00 <br />(gen.) _ <br />Visibility: <br />1.00 <br />(avg.) <br />Material consistency description : <br />Job efficiency: <br />0.83 <br />(1shift1day) <br />Compacted fill or embankment <br />Spoil pile: <br />0.80 <br />(fnd - rf) <br />Push gradient: <br />0.90 <br />( Cat HB) <br />Average push gradient : <br />5.00 % (pos) Altitude : <br />0.95 <br />(Cat HB) <br />Average site altitude : <br />8,100 feet Material weight: <br />0.87 <br />( Cat HB) <br />Blade type : <br />1.00 <br />(S/SU /U) <br />Material weight: <br />Z650 Ibs /LCY Net correction : <br />0.33 <br />Weight description : <br />Decom posed rock - 25% Rock, 75% Earth Adjusted unit production : <br />414.97 <br />LCY /hr <br />Adjusted fleet production : <br />414.97 <br />LCY /hr <br />JOB TIME AND COST <br />Fleet size : <br />i Dozer(s) Total job time: <br />5.80 <br />Hours <br />Unit cost: <br />$0.486 /LCY Total job cost: <br />$1,169 <br />