Laserfiche WebLink
4.03 RCII~D6 <br />• <br />4.03.1 Haul Roads. (OOnt'd.) <br />(5) (a) <br />The Orchard Valley Mine haul road is asphalt surfaced. The surface has <br />been proven to be sufficiently durable for the anticipated volume of <br />traffic and weight arxi speed of the vehicles. <br />The Orchard Valley West haul road is gravel surfaced. The surface has <br />been proven to be sufficiently durable for the anticipated volume of <br />traffic and weight and speed of the vehicles. <br />The Orchard Valley R-0-M coal stoc3q~ile haul road is gravel surfaced. The <br />surface is designed to be sufficiently durable for the anticipated volume <br />and weight and speed of the vehicles. COVCC constructs and maintains the <br />surface of this road to provide service Life as required by the mine <br />operations. ODVCC commits to tracking the utilization of this road and <br />reassessing the service life of the road prior to exceeding the truck-day <br />utilization projection defining the service life (refer to Supplemental <br />Geotechnical Engineering Study, Low Grade Coal Haul Road, Lambert and <br />Associates, Volume 6). Utilization records will be maintained and made <br />available to the Division for review upon request. <br />• <br />Twelve inches (12") of gravel was added to the bearing surface of the <br />Orchard Valley R-0-M coal stockpile haul road in accordance with the <br />design specifications detailed in the Lambert study during June, 1992. <br />The additional gravel provided a minimum three year service life based <br />upon the usage rates projected in the study. Utilization records have <br />been maintained since that time and are available for review at the mine. <br />(5) (b) <br />Asphalt and gravel are Division approved surfacing materials and do not <br />contain acid or toxic forming substances. <br />(6) (a) <br />COVCC owns and operates equipment capable of assuring proper maintenance <br />of shoulder, surface, parking and side areas, approach structures and <br />erosion control devices, and cut and fill section repairs as required. <br />The equipment includes: a motor grader, front end loaders, backhoes with <br />front end loaders, and a dump truck. Any major repairs that rewire <br />specialty equipment are performed by contractors. <br />COVGC will maintain the Orchard Valley West Mine haul road from the mine <br />site to the intersection of Steven's Gulch road. CDVCC will also maintain <br />Steven's Gulch road to the entrance of the existing Orchard Valley Mine <br />site. Appropriate maintenance will be continued in a regular manner as <br />identified by regular inspection. <br />• <br />Maintenance of the Orchard Valley RAM coal stockpile haul road will be <br />conducted in a regular manner as identified by periodic inspection. <br />(6) (b) <br />The Orchard Valley Mine haul road is maintained in a regular manner. Zhis <br />TR 92-18 <br />Revised 07/08/99 <br />12 <br />