Laserfiche WebLink
2.05 APPLICATION FOR PERMIT FOR SURFACE OR UNDERGROUND MINING ACTIVITIES - <br />MINIMUM REQUIREMENTS FOR OPERATION AND RECLAMATION PLANS. <br />• use of scrapers placing material and dozers passing no more than twice <br />over the redistributed area. <br />(6) Not Applicable. <br />(a) Not Applicable. <br />(i) Not Applicable. <br />(ii) Not Applicable. <br />(A) Not Applicable. <br />(B) Not Applicable. <br />(C) Not Applicable. <br />(D) Not Applicable. <br />(iii) Not Applicable. <br />(iv) Not Applicable. <br />(v) Not Applicable. <br />(vi) Not Applicable. <br />• (vii) See Map 8A-6. <br />(b) Not Applicable. <br />(c) Not Applicable. <br />(i) Not Applicable. <br />(ii) Not Applicable. <br />(iii) Not Applicable. <br />(iv) Not Applicable. <br />(v) Not Applicable. . <br />(d) Not Applicable. <br />(i) Not Applicable. <br />(ii) Not Applicable. <br />(7) See 2.05.3(3)(b) and Figures 2.05-1 and 2.05-2 in the Mine Facilities <br />Appendix in volume BA. <br />The coal handling structures at the West Mine included: an overhead <br />conveyor belt system, stacker, and ground coal storage. Coal was <br />produced from the West Mine from 1987 through mid 1993 and hauled to <br />. the existing truck dump and train loadout facilities. In mid 1993 the <br />North Mains by-pass was constructed which allowed coal to be handled <br />and processed through the East Mine Portals and facilities. <br />Permit Renewal - 35 - 01/03 <br />RN-oy (Y~9~6Y) <br />/hR-! O 6 <br />