Laserfiche WebLink
SUMMIT COUNTY LAND USE AND DEVELOPMENT CODE <br />CHAPTER 10: Areas and Activities of State Interest <br />H. Additional Submittal Requirements Applicable to Airports <br />In addition to the Submittal Requirements in Part 10200 D, above, the following additional requirements shall <br />apply to Airports: <br />1. Map and description of nearby land uses. Expected impact of new airport on those land uses and nearby <br />property owners from noise and traffic. <br />2. Map and description of flight patterns as related to other land uses. Description of potential public safety <br />and property issues related to the airport and plane crashes. <br />3. Description of how the airport will affect existing communities, the environment and existing community <br />services. <br />4. Description of how the airport will affect economic and transportation needs of the state and the area. <br />5. Description of applicable adopted master plans and whether facilities comply with these provisions. <br />1. Additional Submittal Requirements Applicable to Arterial Highways, Interchanges and Collector <br />Highways <br />In addition to the Submittal Requirements in Part 10200 D, above, the following additional requirements shall <br />apply to arterial highways, interchanges and collector highways: <br />1. Description of how project will affect traffic patterns as well as non-motorized traffic. <br />2. Description of how the new roads will likely affect surrounding land uses and existing community patterns. <br />3. Description of how new roads will serve community traffic demands. <br />4. Description of how new roads will comply with other local, State and federal regulations and master plans. <br />J. Additional Submittal Requirements Applicable to Rapid or Mass Transit Facilities <br /> <br />In addition to the submittal requirements in Part 10200 D, above, the following additional requirements shall • <br />apply to Rapid or Mass Transit Facilities: <br />1. Development in areas around Rapid or Mass Transit Facilities shall require the following additional <br />submittals: <br />a. One (1) or more maps at sufficient scale showing the location of the proposed development and its <br />relationship to the rapid or mass transit station or terminal and the interchanges, streets, highways, <br />parking lots and public facilities which are adjacent to or form an integral part of the operation of the <br />Rapid or Mass Transit Facility. <br />b. A narrative description of the motor vehicle, bicycle and pedestrian traffic likely to be generated by the <br />proposed development, including but not limited to traffic generation at various times of the day, <br />potential congestion and potential demand for parking generated by the development. <br />c. A narrative description of the impacts of the proposed development to the Rapid or Mass Transit <br />Facility. <br />d. Maps or diagrams illustrating the pedestrian and bicycle routes that can be utilized to gain access <br />between the proposed development and the adjacent Rapid or Mass Transit Facility. <br />2. Rapid or Mass Transit Facilities shall require the following additional submittals: <br />a. A general narrative description stating whether the proposed facility is a station, terminal, fixed <br />guideway or other Rapid or Mass Transit Facility. The narrative description shall give a description of <br />the location of the proposed facility, including intersections, towns, existing and planned facilities and <br />landmark features. The narrative description shall also describe the impacts of the facility, and <br />associated activities, on the character of the area and its peculiar suitability for particular uses with a <br />view to conserving the value of buildings and encouraging the most appropriate use of land throughout <br />the unincorporated area of Summit County. <br />b. One (1) or more maps at sufficient scale, showing the location of the proposed facility together with <br />proposed or existing transportation corridors, zoning classification and land use within 2000 feet. <br />c. Fixed Guideways: If the proposed facility is a fixed guideway, the application shall also include: <br />18 is