Laserfiche WebLink
March 22,2011 C-1981-010/Trapper Mine RDZ <br /> RECLAMATION SUCCESS -Rule 4.15,Rule 3: <br /> Due to snow conditions,the ground was not visible at many locations during the inspection. On the areas that <br /> were visible,no problems such as gullies on reclaimed areas were observed. Small rills were observed on the <br /> reclaimed slope north of the Ash Pit,and this area requires continual monitoring. <br /> A contour ditch in Area F-AB-05 was inspected and was in good shape. <br /> SUPPORT FACILITIES -Rule 4.04: <br /> No problems were observed at any support facilities.The areas inspected were: the East Panel Ready Line,the <br /> ANFO truck storage("the Blast Hole"),the water tanks (potable and recycle), and the shop/office area. <br /> SIGNS AND MARKERS—Rule 4.02: <br /> The mine ID and blasting signs at the main mine entrance,at the entrance near the power plant,and the entrance <br /> near Coyote Gulch pond were found to be in compliance. <br /> Perimeter markers were observed in three locations: below Johnson Gulch ponds,below East Middle Flume <br /> ponds, and below Coyote dam No compliance issues were observed. <br /> Topsoil markers were observed for several piles; all were found to be in compliance. <br /> Number of Partial Inspection this Fiscal Year: 8 <br /> Number of Complete Inspections this Fiscal Year: 3 <br /> Page 4 of 12 <br />