My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-03-25_REVISION - M1992066
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1992066
>
2011-03-25_REVISION - M1992066
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 3:11:57 PM
Creation date
3/30/2011 1:40:27 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1992066
IBM Index Class Name
REVISION
Doc Date
3/25/2011
Doc Name
Amendment approval & FW request (AM-02)
From
DRMS
To
Duckels Construction, Inc.
Type & Sequence
AM2
Email Name
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page I of 2 <br />EQUIPMENT MOBILIZATION/DEMOBILIZATION <br />Task description: Mobilize reclamation crew/equipment <br />Site: Hogue/River Pit Permit Action: AM2 Permit/Job#: M1992066 <br />PROJECT IDENTIFICATION <br />Task #: 006 State: Colorado <br />Date: 3/10/2011 County: Routt <br />User: DMC <br />Agency or organization name: DRMS <br />EQUIPMENT TRANSPORT RIG COST <br />Shift basis: 1 per day <br />Cost Data Source: CRG Data <br />Truck Tractor Description: GENERIC ON-HIGHWAY TRUCK TRACTOR, 6X4, DIESEL POWERED, <br />400 HP (2ND HALF, 2006) <br />Truck Trailer Description: GENERIC FOLDING GOOSENECK, DROP DECK EQUIPMENT TRAILER <br />(25T, 50T, AND 100T) <br />Cost Breakdown: <br />Available Rig Capacities 0-25 Tons 26-50 Tons 51+ Tons <br />Ownership Cost/Hour: $16.63 $18.37 $22.33 <br />Operating Cost/Hour: $44.38 $46.13 $50.07 <br />Operator Cost/Hour: $27.66 $27.66 $27.66 <br />Helper Cost/Hour: $0.00 $25.39 $25.39 <br />Total Unit Cost/Hour: $88.67 $117.55 $125.45 <br />NON ROADABLE EQUIPMENT: <br />Machine Weight/ Owner ship Haul Rig Fleet Haul Trip Return Trip DOT Permit <br />Description Unit Cost/hr/ unit Cost/hr/unit Size Cost/hr/ Cost/hr/ fleet Cost/ fleet <br /> (TONS) fleet <br />Cat D8R Series II - 47.80 $39.08 $117.55 2 $313.25 $235.10 $250.00 <br />8U (2005 <br />CAT 972G (2002) 27.49 $27.23 $117.55 2 $289.56 $235.10 $500.00 <br />Drill/Broadcast 25.00 $39.59 $88.67 1 $128.26 $88.67 $250.00 <br />Seeder with Tractor <br />Subtotals: $731.07 $558.87 $1000.00 <br />ROADABLE EQUIPMENT: <br />Machine Description Total Cost/hr/ unit Fleet Size Haul Trip <br />Cost/hr/ fleet Return Trip <br />Cost/hr/ fleet <br />Light Du Pickup, 4x4, 1 T. Crew $20.91 1 $20.91 $20.91 <br />Subtotals: $20.91 $20.91 <br />Abbreviation: None <br />Filename: M066-006 <br />CIRCES Cost Estimating Software
The URL can be used to link to this page
Your browser does not support the video tag.