Laserfiche WebLink
Reveg Worksheet Cont'd Task # 005 Page 2 of 2 <br />MULCHING and MISCELLANEOUS <br />Materials <br /> <br />Description Units / <br />Acre <br />Unit <br />Cost / Unit <br />Cost /Acre <br />Straw, delivered DMG survey data 2.00 TON $113.04 $226.08 <br />Total Mulch Materials Cost/Acre $226.08 <br />A lication <br />Description Cost /Acre <br />Crimping, with tractor DMG survey data $63.75 <br />Total Mulch Application Cost/Acre $63.75 <br />NURSERY STOCK PLANTING <br /> <br />Common Name No / <br />Acre Type and Size Planting <br />Cost Fertilizer <br />Pellet Cost <br />Cost /Acre <br />Alder 1 Container, 5 gallon (MEANS) $43.84 $2.40 $43.84 <br />Cottonwood, <br />Narrowleaf 1 Container, 5 gallon (MEANS) $47.71 $2.40 $47.71 <br />Spruce, Blue 1 Container, 5 gallon (MEANS) $58.19 $2.40 $58.19 <br />Totals Nurser Stock Cost / Acre $149.74 <br />JOB TIME AND COST <br />Estimated Failure Rate: <br />*Selected Replanting Work Items: <br />No. of Acres: <br />10 Cost /Acre <br />25% Cost /Acre* <br />FERTILIZING,TILLING, SEEDING,NU <br />RSERY,MULCHING <br />$742.42 <br />$742.42 <br />Initial Job Cost: <br />Reseeding Job Cost: <br />Total Job Cost: <br />Job Hours: <br />$7,424.20 <br />$1,856.05 <br />$9,280.25 <br />20.00 <br />CIRCES Cost Estimating Software