Bid Pricing - Fruita Mine Bond Revocation Project <br />Project Bid PKA-9-1149 <br />January 27, 2009 <br />Task 11- Provide a Polyurethane foam plug, if necessary <br />This item is to provide a PUF enclosure in the mine portal should it be necessary for a safe <br />closure once the portal opening is uncovered. This item includes all labor, equipment, material, <br />and support costs to provide 10 cubic yards of PUF. It will be reimbursed on a cubic yard of <br />PUF placed. <br />Upon award of the contract, J3 is prepared to enter into an agreement with the State, and has no <br />issues with the sample purchase order language provided in the bid package. In addition, as <br />part of contract submittals, J3 will prepare and submit the following items to the State: <br />A site-specific Safety, Health, and Environmental Action Plan (SHEAP) that will address all <br />of the required elements as indicated in the bid documents, including but not limited to <br />personal protective equipment (safety glasses, reflective traffic vests, steel-toed boots, and <br />hard hats, safety harnesses and lanyards), first aid kits and supplies, fire protection <br />equipment, a fire safety procedure, job safety analysis sheets detailing the hazards of the <br />work as well as specific to each task, a training procedure to the plan and JSAs, maps to the <br />nearest medical facility, accident prevention and reporting procedures, on-site hand and <br />radio communications, site access procedures, the J3 substance abuse policy, a project <br />organizational chart detailing the roles of each key person such as the Health and Safety <br />representative, daily tailgate meeting record logs, equipment inspection logs and <br />procedures, elevated area work procedures, procedures around hazardous mine openings, <br />procedures for handling all generated wastes - both liquids and solids, and hot work <br />procedures, as necessary. <br />- Surety - provide the necessary surety required for execution of the agreement and <br />performance of this project. In this case, it appears that performance, labor and material <br />payment bonds will be necessary for this project, according to the bid documentation and <br />sample purchase order terms and conditions. <br />- Certificates of Insurance - showing proof of required coverage, including fire protection, and <br />naming the State as an additional insured. <br />AML Contractor Ownership and Control Form - we will complete this form and submit with <br />the contract documents as required. <br />Minority (MBE) and Women (WBE) Owned Business Participation Form - we will complete <br />this form and submit with the contract documents, as required. <br />Construction Project Schedule - we anticipate the work to take approximately 10 working <br />days and propose to work, from 7:00 am to 5:00 pm, Monday through Saturday to <br />accomplish the scope of work. J3 is prepared to start work activities by February 23, 2009 to <br />allow for completion within 19 days of the Notice to Proceed, including mobilization and <br />demobilization. We anticipate completion of the above scope of work in accordance with the <br />project schedule, on or about March 13, 2009. <br />Subcontractor List - J3 will self-perform most of the scope of work, with the exception of the <br />hauling of equipment to the project site. That work will be performed by the equipment <br />vendor. <br />Pg. 4 of 5 www.j3env.com i35