Bid Pricing - Fruita Mine Bond Revocation Project <br />Project Bid PKA-9-1149 <br />January 27, 2009 <br />Task 5 - Portal Repair and Rock Apron <br />V will be excavated to a depth of 10-feet long by 3-feet wide, by 8-foot deep. Upon <br />completion of this excavation, should the portal opening be stabilized, 18- to 24-inch <br />rock will be utilized to backfill to a depth of 5-feet. The rock will be gathered from on-site <br />sources. Above the rock layer, the excavation soils will be placed to original grade <br />surface. We will utilize a track excavator, front end loader, and hand labor to perform <br />this work. A rock channel apron will be installed over the repaired portal, using on-site <br />18-inch to 24-inch rock. The apron will be constructed 5-feet wide, 10-feet long, and 3- <br />feet deep, keyed in to a depth of 2-feet on both sides. <br />We will utilize a track excavator (John Deere 330 or equivalent), front end loader (John <br />Deere 744 with a 5.5 yard bucket, or equivalent), and hand labor to complete this task. <br />Task 6 - Restore Vegetation <br />Replace vegetation in all disturbed areas. We will do this by preparing the seed bed, <br />broadcast spreading seed and fertilizer, and placement and crimping of mulch using the <br />track excavator. The mulch will be certified weed free, with documentation of each <br />material utilized provided to the state for their records, including fertilizer. We anticipate <br />approximately 1 acre of restoration to be completed on this project. <br />We will utilize broadcast spreaders for the seed and fertilizer, a track excavator for <br />crimping of mulch and preparing seed bed, and labor to perform this task. <br />Additional Bid Items <br />These items are all optional, and will be as needed. A brief description of our understanding of <br />each is as follows: <br />Task 7 - Equipment Rental <br />Rental of a track excavator and operator to perform additional work on the project site not <br />detailed within the scope of work. This includes all fuel, maintenance, and support costs <br />associated with operating the track excavator for each hour. This item will be billed on a time <br />and materials basis per the rate provided. <br />Task 8 - Provide Additional Rip Rap (from on-site source) <br />This item is for the location and placement of additional rip rap needed, per the project <br />specifications. This rip rap is from an on-site source and will be in additional to the amount <br />prescribed in the scope of work. <br />Task 9 - Install Additional Rock Check Dams <br />This item is for additional rock check dams in exceedence of the quantity listed on the bid <br />schedule. It includes all labor, equipment, material, and support costs to complete each <br />additional check dam. <br />Task 10 - Install Additional Bench Check Dams <br />This item is for additional bench check dams. <br />Pg. 3 of 5 www.j3env.com iQ