Laserfiche WebLink
Amendment Application 2011 Exhibit Page 11 <br />Amendment Application Exhibit Page 11 <br />TABLE E-2. Revised summary of reclamation areas (complete project) <br />Area Nature Size Key features Actions <br /> acres <br />First Stage: <br />North Entry Road/verges 1.2 Permanent roads/ditches Complete: vegetated <br />South Tail Return flow 0.3 Permanent pipe and Complete: accepted <br /> pipeline outfall b landowner <br />Second Stage Dry 2.7 Shoreline on east, south To be reshaped to <br /> final configuration <br /> Water 3.8 Most of Pond #4 and vegetated 2011 <br />Third Stage Dry 3.1 Entire South Field To be mined and <br /> reclaimed over five <br /> Wet 3.5 Pond #5 ears <br />Fourth Stage Dry 3.0 West shoreline Most work done <br /> during third stage, <br /> Wet 3.1 Parts Ponds #2, #3, #4 final after 2016 <br />Final Stage Dry 3.1 North area (s of entry End of project: final <br /> road) shaping, roads <br /> Wet 3.3 Pond #1, Part Pond #2 <br />Exterior berms (stockpiles) will be used during reclamation of each adjacent stage. <br />Although shown in distinct stages for ease of understanding, some reclamation work <br />will be done each year of operation. <br />Actions will include standard: rough grading, fine grading, scarification (where <br />appropriate), placement of soil, seeding, and protection while revegetation. <br />Stone Sand & Gravel, LLC 15 MAR 2011 <br />Application for Amendment to Permit M-2001-001: Line Camp Pit SSG-LCP-D1-001