Laserfiche WebLink
Connell Resources Timnath Pit <br />Spill Prevention Control and Countermeasures Plan <br />Revision Date: June 25, 2009 <br />Section 6.0 Drainage Control Diversionary Structures And Containment [112.7(a)(3) and (c)] <br />Page 6-1 <br />I Section 6.0 Drainage Control Diversionary Structures And Containment [112.7(a)(3) <br />and (c)] <br />' Specific spill prevention and control measures (i.e., specific to the oil storage, use or <br />operation) are identified in Section 8.0 through Section 22.0 of this SPCC Plan. <br />¦