Laserfiche WebLink
Connell Resources Timnath Pit <br />Spill Prevention Control and Countermeasures Plan <br />Revision Date: June 25, 2009 <br />Section 3.0 Site Description (112.7(a)(3)] <br />Page 3-2 <br />operate and maintain vehicles and lubricate equipment. These liquid products may be <br />received by tanker truck or in drums or tote tanks. <br />3.6 Wastewater Treatment Systems <br />The Facility has a no treatment facilities. <br />3.7 Facility Storage <br />Details of containers and tanks used to store oil/fuel at the Facility is provided in Appendix <br />B. Figure 2 in Appendix A illustrates the facility layout and the location of oil storage <br />containers. <br />3.8 Discharge Prevention Measures and Discharge or Drainage Controls <br />Discharge prevention measures and discharge and drainage controls are addressed in <br />Section 8.0 through Section 22.0. <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />