Laserfiche WebLink
Connell Resources Timnath Pit <br />Spill Prevention Control and Countermeasures Plan <br />Revision Date: June 25, 2009 <br />Section 2.0 Requirements for the Preparation and Implementation of an SPCC Plan [112.3] <br />Page 2-2 <br />• Location of the facility, <br />• Maximum storage or handling capacity of the facility and normal daily throughput, <br />• Corrective action and countermeasures you have taken, including a description of <br />equipment repairs and replacements, <br />• An adequate description of the facility, including maps, flow diagrams, and <br />topographical maps, as necessary, <br />• The cause of such discharge, including a failure analysis of the system or subsystem <br />in which the failure occurred, <br />Additional preventive measures that have been taken or have been contemplated to <br />minimize the possibility of recurrence, and <br />• Such other information as the Regional Administrator may reasonably require <br />pertinent to the Plan or discharge. <br />The mailing addresses for the EPA Regional Administrator and the Colorado Department of <br />Labor and Employment, Division of Oil and Public Safety (OPS) are as follows: <br />Regional Administrator <br />US EPA Region 8 <br />999 18th Street, Suite 300 (8EPR-SA) <br />Denver, CO 80202-2466 <br />Main Number: (800) 227-8917 <br />SPCC Coordinator: (303) 312-6496 <br />Colorado Department of Labor and Employment <br />Division of Oil and Public Safety <br />(Technical Reviewer's Name - if known) <br />633 17th Street, Suite 500 <br />Denver, CO 80202-3660 <br />The Regional Administrator, as a result of the spill or spills, may require Connell to modify <br />the SPCC Plan for, and SPCC measures at the Facility to prevent reoccurence of an oil spill. <br />