Laserfiche WebLink
Pagel of 2 <br />SCRAPER TEAM WORK <br />Task description: Establish 3:1 slopes from 2:1 <br />Haldorson Sand and Gravel Permit Action: <br />Site: Mine 2011 Review <br />PROJECT IDENTIFICATION <br />Task #: 02A State: Colorado <br />Date: 3/21/2011 County: Montrose <br />User: GRM <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />-Scraper: Cat 637G <br />-Dozer: NA <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance -Motor Grader: NA <br />-Water Truck: NA <br />Cost Breakdown! Scraner Wnrk Team Rnnnnrt Fnninment Maintenance Fnninment <br /> Scraper Dozer Load Area Dump Area Motor Grader Water Truck <br />%Utilization-machine: 100 NA NA NA NA NA <br />Ownership cost/hour: $80.72 NA NA NA NA NA <br />Operating cost/hour: $178.12 NA NA NA NA NA <br />Ripper op. cost/hour: NA NA NA NA NA NA <br />Operator cost/hour: $24.95 NA NA NA NA NA <br />Unit Subtotals: $283.79 NA NA NA NA NA <br />Number of Units: 8 0 0 0 0 0 <br />Group Subtotals: Work: $2,270.32 Support: $0.00 Maint: $0.00 <br />Total work team cost/hour: $2,270.32 <br />MATERIAL OUANTITIES <br />Initial volume: 81,250 CCY Swell factor: 1.250 <br />Loose volume: 101,563 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Scraner Bowl (volume) Basis: <br />Material weight: 2,550 lbs/LCY <br />Material description: Earth - Dry packed <br />Rated Payload: 75,000 pounds <br />Payload Capacity: 29.41 LCY <br />Permit/Job#: M2003037 <br />Abbreviation: None <br />Filename: M037-02a <br />COSTShift basis: 1 per day <br />iption <br />Struck Volume: 24.00 LCY <br />Heaped Volume: 34.00 LCY <br />Average Volume: 29.00 LCY <br />Adjusted Capacity: 29.00 LCY <br />CIRCES Cost Estimating Software