My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-03-22_REVISION - M2003037 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2003037
>
2011-03-22_REVISION - M2003037 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:44:25 AM
Creation date
3/29/2011 9:58:29 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2003037
IBM Index Class Name
REVISION
Doc Date
3/22/2011
Doc Name
Cost summary (SI-02)
From
DRMS
To
Haldorson Sand and Gravel
Type & Sequence
SI2
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEMOLITION WORK <br />Task description: Demo concrete / asphalt plant pads / pylons <br />Haldorson Sand and Gravel Permit Action: <br />Site: Mine 2011 Review Permit/Job#: M2003037 <br />PROJECT IDENTIFICATION <br />Task #: OlA <br />Date: 3/22/2011 <br />User: GRM <br />State: Colorado <br />County: Montrose <br />Agency or organization name: DRMS <br />UNIT COSTS <br />Abbreviation: None <br />Filename: M037-01a <br />Location adjustment: 96.90 % <br />Structure or Item <br />Dimensions Demolition Menu <br />Quantity <br />Unit Unit Total Cost <br />Description Selection Cost <br />concrete pad 15 X 17 Demo. and on-site 255.00 SF $3.14 $800.70 <br /> disposal in existing pit, <br /> 12 in. thick - Max. 200 <br /> ft. push <br />concrete pad 20 X 10 Demo. and on-site 200.00 SF $3.14 $628.00 <br /> disposal in existing pit, <br /> 12 in. thick - Max. 200 <br /> ft. push <br />concrete pad 14 X 13 Demo. and on-site 182.00 SF $3.14 $571.48 <br /> disposal in existing pit, <br /> 12 in. thick - Max. 200 <br /> ft. push <br />concrete peers 6'X 30" Pipe, reinforced concrete 72.00 LF $11.41 $821.52 <br /> (RCP) - 30 in. diameter <br /> pipe <br />concrete secondary 20'X 50' Demo. and on-site 1,000.00 SF $1.76 $1,760.00 <br />containment disposal in excavated pit, <br /> 6 in. thick - Max. 50 ft. <br /> push <br />Job Hours: <br />Total Cost <br />Subtotal (adjusted for <br />24.00 (unadjusted): $4,581.70 location): $4,439.67 <br />
The URL can be used to link to this page
Your browser does not support the video tag.