Laserfiche WebLink
Truck/Loader Worksheet Cont'd Task # 11A Page 3 of 3 <br />Annl Rnnta• <br />Seg # Haul Distance Grade (%) Roll. Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> min <br />1 650.00 0.00 5.00 5.00 2218 0.361 <br />2 850.00 15.00 5.00 20.00 556 1.142 <br />R afiirn Rroita• <br />Haul Time: <br />1.503 <br />minutes <br /> Seg # Haul Distance <br />(Ft) Grade (%) Roll. Res Total Res Velocity <br />(fpm) Travel <br />Time <br />min <br /> 1 850.00 -15.00 5.00 -10.00 2938 0.362 <br /> 2 650.00 0.00 5.00 5.00 2814 0.231 <br /> <br /> Return Time: 0.593 minutes <br /> Total Truck Cycle Time: 4.164 minutes <br />Loading Tool unit <br />Production 480.63 LCY/Hour Adjusted for job efficiency: 398.92 LCY/Hour <br />Truck Unit Production <br /> 134.85 LCY/Hour Adjusted for job efficiency: 111.93 LCY/Hour <br />Optimal No. of Trucks: 4 Truck(s) Selected Number of Trucks: 4 Truck(s) <br /> Adjusted hourly truck team production: 447.72 LCY/Hour <br /> Adjusted single truck/loader team production: 398.92 LCY/Hour <br /> Adjusted multiple truck/loader team production: 398.92 LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 1 <br />Unit cost: $0.896 <br />Team(s) Total job time: 229.13 Hours <br />/LCY Total job cost: $81,860.75 <br />CIRCES Cost Estimating Software