My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-03-22_REVISION - M2003037 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2003037
>
2011-03-22_REVISION - M2003037 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:44:25 AM
Creation date
3/29/2011 9:58:29 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2003037
IBM Index Class Name
REVISION
Doc Date
3/22/2011
Doc Name
Cost summary (SI-02)
From
DRMS
To
Haldorson Sand and Gravel
Type & Sequence
SI2
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Truck/Loader Worksheet Cont'd Task # 11A Page 2 of 3 <br />Truck Bed (volume) Basis. <br />Struck Volume: 10.00 LCY <br />Heaped Volume: 12.00 LCY <br />Average Volume: 11.00 LCY <br />Adjusted Volume: 12.00 LCY <br />Final Truck Volume Based on Number of Loader Passes: 9.36 LCY <br />Loading Tool Capacity <br />Bucket Size Class: NA <br />Rated Capacity: 4.800 LCY (heaped) <br />I <br />Bucket Fill Factor: 0.975 Loose material - mixed moist aggregates <br />Adjusted Capacity: 4.680 LCY <br />Job Condition Corrections: Site Altitude (ft.): 5800 feet <br /> Truck Loader Source <br />Altitude Adj: 1.000 0.920 (CAT HB) <br />Job Efficiency: 0.830 0.830 (CAT HB) <br />100%) O.975 <br />Net Correction: 1 0.830 0.764 <br />Loading Tool Cycle Time: Number of Loading Tool Passes Required to Fill Truck: <br />Excavators and Front Shovels: <br />Machine Cycle Time vs. Job Condition Rating: NA <br />Selected Value within this Basic Rating: NA <br />Track Loaders - Material Description: <br />Cycle Time Elements (min.): <br />Load: NA Maneuver: NA Dump: 0.100 <br />Wheel and Track Loaders - Unadjusted Basic Loader Cycle Time (load, dump, maneuver): 0.575 <br />minutes <br />Cycle Time Factors Factor (min.) Source <br />Material: Mixed material 0.02 0.020 (Cat HB) <br />Stoc ile: No adjustment - factor not applicable 0.00 0.000 (Cat HB) <br />Truck Ownershi : Common ownership of trucks and loaders -0.04 -0.040 Cat HB <br />Operation: Constant operation -0.04 -0.040 (Cat HB) <br />Dump Target: Nominal target 0.00 0.000 (Cat HB) <br /> Net Cycle Time Adjustment: -0.060 minutes <br /> Adjusted Loader Cycle Time: 0.515 minutes <br /> Net Load Time per Truck: 0.615 minutes <br />Truck Cycle Time: <br />Truck Exchange Time: 0.50 Minutes Adjusted for site altitude: 0.500 Minutes <br />Truck Load Time: 0.615 Minutes Adjusted for site altitude: 0.668 Minutes <br />Truck Maneuver and Dump Time: 0.90 Minutes Adjusted for site altitude: 0.900 Minutes <br />Truck Travel (Haul & Return) Time: Road Condition: Rutted dirt, little maintenance, no water, 2" tire <br />penetration 5.0 <br /> CIRCES Cost Estimating Software <br />2 passes
The URL can be used to link to this page
Your browser does not support the video tag.