My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-03-24_REVISION - M1977170
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977170
>
2011-03-24_REVISION - M1977170
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:44:25 AM
Creation date
3/29/2011 9:58:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977170
IBM Index Class Name
REVISION
Doc Date
3/24/2011
Doc Name
Cost summary (SI-02)
From
DRMS
To
Butala Gravel
Type & Sequence
SI2
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 2 <br />SCRAPER TEAM WORK <br />Task description: Replace topsoil in Phase 1 <br />Site: Butala Gravel Pit Permit Action: 2011 Review Permit/Job#: M1977170 <br />PROJECT IDENTIFICATION <br />Task #: 04A State: Colorado <br />Date: 3/24/2011 County: Chaffee <br />User: GRM <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />COSTShift basis: 1 per day <br />iption <br />-Scraper: Cat 631G <br />-Dozer: Cat D8R Series II - 8U (2005) <br />Abbreviation: None <br />Filename: M170-04a <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance -Motor Grader: NA <br />-Water Truck: NA <br />Cast Rrenkdown! Seraner Work Team Sunnort Eauinment Maintenance Eauinment <br /> Scraper Dozer Load Area Dump Area Motor Grader Water Truck <br />%Utilization-machine: 100 100 NA NA NA' NA <br />Ownership cost/hour: $66.05 $45.97 NA NA NA NA <br />Operating cost/hour: $132.44 $81.13 NA NA NA NA <br />Ripper op. cost/hour: NA $6.37 NA NA NA NA <br />Operator cost/hour: $24.95 $38.49 NA NA NA NA <br />Unit Subtotals: $223.43 $171.95 NA NA NA NA <br />Number of Units: 2 1 0 0 0 0 <br />Group Subtotals: Work: $618.81 Support: $0.00 Maint: $0.00 <br />Total work team cost/hour: $618.81 <br />MATERIAL QUANTITIES <br />Initial volume: 8,067 CCY Swell factor: 1.125 <br />Loose volume: 9,075 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Scraper Bowl (volume) Basis: <br />Material weight: 2,6501bs/LCY <br />Material description: Decomposed rock - 25% Rock, <br />75% Earth <br />Rated Payload: 75,000 pounds <br />Payload Capacity: 28.30 LCY <br />Struck Volume: 24.00 LCY <br />Heaped Volume: 34.00 LCY <br />Average Volume: 29.00 LCY <br />Adjusted Capacity: 28.30 LCY <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.