My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-03-24_REVISION - M1977170
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977170
>
2011-03-24_REVISION - M1977170
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:44:25 AM
Creation date
3/29/2011 9:58:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977170
IBM Index Class Name
REVISION
Doc Date
3/24/2011
Doc Name
Cost summary (SI-02)
From
DRMS
To
Butala Gravel
Type & Sequence
SI2
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scraper Worksheet Cont'd Task # 03A Page 2 of 2 <br />Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />1.00 Minutes <br />0.70 Minutes <br />Site Altitude: 7190 feet <br /> Scraper Push Dozer Source <br />Altitude Ad': 1.000 1.000 (CAT HB) <br />Job Efficiency: 0.830 0.830 (CAT HB) <br />Net Correction: 0.830 0.830 <br />Travel Time: <br />Road Condition: Rutted dirt, little maintenance, no water, 2" tire penetration 5.0 <br />Haul Route: <br />Seg # Haul Distance( t) Grade <br />(% Roll. Res <br />% Total Res <br />% Velocity (fpm) Travel Time <br />(min) <br />1 700.00 0.00 5.00 5.00 1343 0.63 <br />Return Route- <br />Haul Time: 0.63 minutes <br />Seg # Haul Distance (Ft) Grade Roll. Res Total Res Velocity (fpm) Travel Time <br />(min) <br />1 700.00 0.00 5.00 5.00 2445 0.50 <br />Return Time: 0.50 minutes <br />Total Scraper team cycle time: 2.83 minutes <br />Adjusted for job conditions: 498.03 LCY/Hour <br />Selected Number of Scrapers: 2 Scraper(s) <br />Adjusted single scraper team (unit) hourly production: 996.07 LCY/Hour <br />Adjusted multiple scraper team (fleet) hourly production: 996.07 LCY/Hour <br />Unadjusted unit production/hour: 600.04 LCY/Hour <br />Optimal Number of Scrapers per push dozer: <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: 4.90 Hours <br />Unit cost: $0.659 /LCY Total job cost: $3,213.53 <br />CIRCES Cost Estimating Software
The URL can be used to link to this page
Your browser does not support the video tag.