My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-01-03_GENERAL DOCUMENTS - P2008043 (3)
DRMS
>
Day Forward
>
General Documents
>
Prospect
>
P2008043
>
2011-01-03_GENERAL DOCUMENTS - P2008043 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:28:25 PM
Creation date
3/29/2011 8:15:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2008043
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
1/3/2011
Doc Name
Petition For Review Of UIC Permit- 2.
From
Coloradoans Against Resources Destruction
To
EPA
Permit Index Doc Type
Gen. Correspondence
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iii. Written documentation that the requirement for sampling and analysis of rinse <br />water collected from the storage tanks, after they have been cleaned, has been <br />fulfilled. <br />E. SAMPLING, REPORTING OF RESULTS, AND NOTIFICATION REQUIREMENTS <br />1. Sampling Program. <br />(a) Sampling of Groundwater from Injection Well. Before the aquifer-pump <br />test begins, the Permittee shall collect groundwater samples from the A2 <br />sandstone of the Upper Fox Hill Formation from the injection well and <br />analyze the samples as described in Section D.3. <br />(b) Sampling of Iniectate. Before injection begins, the permittee shall collect <br />composite samples from the storage tanks containing the groundwater <br />pumped from the A2 Sandstone of the Upper Fox Hills Formation and <br />analyze the samples as described in Section D.3. <br />The permittee shall notify the Director in advance of any modifications in injection <br />procedures that might result in the potential for the injectate to move outside the A2 sandstone. <br />After reviewing the proposed changes, the Director may add additional monitoring requirements <br />as deemed necessary for the protection of USDWs. <br />2. Samp ling Information. Records of any sample collection activity required under <br />this permit shall include: <br />(a) The date, exact place, and the time of fluid sampling; <br />(b) The name of the individual(s) who performed the fluid sampling; <br />(c) A certification by the individual(s) who performed the sampling as to the <br /> date, exact place, and the time of the sampling; <br />(d) The name and address of the laboratory that performed the <br /> analysis of the fluid; <br />(e) The exact sampling method(s) used to take the samples; <br />(f) The date the fluid sample was sent to the laboratory; <br />(g) The date(s) laboratory analyses were performed; <br />(h) The name of the individual(s) who performed the analyses:. <br />(i) The analytical techniques or methods and quality control used by <br /> laboratory personnel; and <br />(j) The results of the analyses. <br />3. Reporting of Results. The permittee shall submit to the Director the following <br />reports to the Director for review and approval: <br />(a) the analytical results from samples required under Section E.1, and <br />(b) a sununary of the aquifer-pump test results. <br />Powert?ch (USA). Incorporated <br />Final UIC Class V Pemmit No. C051237-08412 <br />Page 4 of 14
The URL can be used to link to this page
Your browser does not support the video tag.