Laserfiche WebLink
PART II. SPECIFIC PERMIT CONDITIONS <br />A. GENERAL <br />Copies of all reports and notifications required by this permit shall be signed and certified <br />in accordance with the requirements under Part III, Section E.9 of this permit and shall be <br />submitted to the EPA: <br />U.S. Environmental Protection Agency - Region 8 <br />Shallow Well Compliance Lead, Mailcode: 8ENF-UFO <br />1595 Wynkoop Street <br />Denver, CO 80202-2699 <br />The EPA permit number the UIC Program Director (hereafter referred to as the <br />"Director") has assigned to this permit is C051237-08412. All correspondence should reference <br />the site name and address and include the EPA permit number. <br />B. SHALLOW INJECTION WELL CONSTRUCTION <br />1. Construction Requirements. The method for construction of any injection well <br />shall not allow the movement of a fluid containing any contaminant into any underground source <br />of drinking water (USDW), if the presence of that contaminant may cause a violation of the <br />primary drinking water standards under 40 CFR Part 141, other health-based standards, or may <br />otherwise adversely affect the health of persons. The construction design for the proposed <br />injection is shown in Figure 2 of Appendix A of this permit. Well construction shall meet the <br />specifications shown in Figure 2. Mechanical integrity testing shall be performed on the well and <br />results submitted to the Director before commencing injection. <br />2. Proposed Changes. The permittee shall give advance notice to the Director as <br />soon as possible and no later than thirty (30) days before any planned physical alterations or <br />additions to the permitted injection well(s) or the injection system. Any alterations to the <br />injection system shall meet all conditions as set forth in this permit. An alteration or addition <br />shall be considered any work performed that affects the quantity or quality of the fluid being <br />injected or changes in the design of the injection system from the construction design diagram in <br />Appendix A of this permit. <br />After approval by the Director, the permittee shall provide plans, as-built schematics, <br />sketches, or other test data, to EPA within sixty (60) days of completion of the alteration or <br />addition that took place. <br />C. CORRECTIVE ACTION <br />No corrective action is required prior to issuance of this permit. <br />Powertech (USA), Incorporated <br />Final UIC Class V Permit No. C051237-08412 <br />Page 2 of 14