My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-03-18_INSPECTION - M2002114
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M2002114
>
2011-03-18_INSPECTION - M2002114
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:31:51 PM
Creation date
3/28/2011 11:16:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2002114
IBM Index Class Name
INSPECTION
Doc Date
3/18/2011
Doc Name
Inspection report
From
DRMS
To
OldcAstle SW Group, Inc.
Inspection Date
3/1/2011
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 2 <br />Task description: <br />Site: 15 Road Gravel Pit <br />SCRAPER TEAM WORK <br />Reclamation Cost Update <br />Permit Action: SI-01 <br />PROJECT IDENTIFICATION <br />Task #: OIA State: Colorado <br />Date: 3/17/2011 County: Mesa <br />User: THM <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />COSTShift basis: 1 per day <br />-Scraper: Cat 627G w/ ush- ull <br />-Dozer: Cat D8R Series II - 8SU (2005) <br />Support Equipment -Load Area: NA <br />-Dump Area: Cat D8R Series II - 8SU (2005 <br />Road Maintenance -Motor Grader: CAT 120H <br />-Water Truck: Water Tanker, 5,000 Gal. <br />!•....a n^,...i.a,....... Q-.- 111-L Ta.m Cimnnrt T7 niinmPnt <br />Maintenance Equipment <br /> Scraper Dozer Load Area Dump Area Motor Grader Water Truck <br />%Utilization-machine: 100 80 NA 50 100 40 <br />Ownership cost/hour: $57.56 $39.08 NA $39.08 $15.04 $22.04 <br />Operating cost/hour: $151.89 $69.68 NA $43.55 $30.37 $16.86 <br />Ripper op. cost/hour: NA $0.00 NA $0.00 $0.00 $0.00 <br />Operator cost/hour: $38.67 $38.49 NA $38.49 $38.49 $0.00 <br />Unit Subtotals: $248.13 $147.25 NA $121.12 $83.90 $38.90 <br />Number of Units: 18 1 0 1 1 1 <br />Group Subtotals: Work: $4,613.59 Support: $121.12 Maint: $122.80 <br />Total work team cost/hour: $4,857.51 <br />MATERIAL QUANTITIES <br />Initial volume: 162,624 CCY Swell factor: 1.000 <br />Loose volume: 162,624 LCY <br />Source of estimated volume: Reclamation Plan Estimate-Worst Case <br />Source of estimated swell factor: Cat Handbook <br />Abbreviation: None <br />Filename: M114-01a <br />HOURLY PRODUCTION <br /> Scraper Bowl (volume) Basis: <br />Material weight: 2,700 lbs/LCY Struck Volume: 15.70 LCY <br />Material description: Sand and clay - Loose Heaped Volume: 22.00 LCY <br />Rated Payload: 48,000 pounds Average Volume: 18.85 LCY <br />Payload Capacity: 17.78 LCY Adjusted Capacity: 17.78 LCY <br />Permit/Job#: M2002114 <br />CIRCES Cost Estimating Software
The URL can be used to link to this page
Your browser does not support the video tag.