Laserfiche WebLink
Loader Worksheet Cont'd Task # 002 <br />Total Travel Time: 0.1218 <br />Total Cycle Time: 0.6218 <br />Load Bucket Capacity <br />Rated Capacity: 2.25 LCY (heaped) <br />Bucket Fill Factor: 0.825 Blasted rock - avg. blasted (75 - 90%) 0.825 <br />Adjusted Capacity: 1.86 LCY <br />Job Condition Correction Factors <br />Site Altitude: 7540 feet <br />Source <br />Altitude Adj: 1.00 (CAT HB ) <br />Job Efficiency: 0.83 (1 shift/day) <br />Net Correction: 0.83 multiplier <br />Unadjusted Hourly Unit Production: 179.11 <br />Adjusted Hourly Unit Production: 148.66 <br />Adjusted Hourly Fleet Production: 148.66 <br /> <br />JOB TIME AND COST <br />Fleet size: 1 Loader(s) Total job time: <br />Unit cost: $0.505 /LCY Total job cost: <br />LCY/Hour <br />LCY/Hour <br />LCY/Hour <br />Page 2 of 2 <br />minutes <br />minutes <br />2.69 Hours <br />$202.00 <br />CIRCES Cost Estimating Software