My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-03-23_PERMIT FILE - P2011001
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2011001
>
2011-03-23_PERMIT FILE - P2011001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:32:00 PM
Creation date
3/25/2011 10:44:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2011001
IBM Index Class Name
PERMIT FILE
Doc Date
3/23/2011
Doc Name
NOI Approval and FW Request
From
DRMS
To
Empress Gold Mining and Milling, Inc.
Email Name
JLE
AJW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Page 1 of 2 <br />WHEEL LOADER - LOAD AND CARRY WORK <br />Task description: Load and carry ore from waste pit to adit <br />Site: Stanley Mine Permit Action: Application <br />PROJECT IDENTIFICATION <br />Task #: 002 State: Colorado <br />Date: 3/17/2011 County: Clear Creek <br />User: JLE <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: CAT 9246 <br />Attachment l: ROPS Cab <br />Cost Breakdown: <br />Horsepower: 114 <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br /> Utilization % <br />Ownership Cost/Hour: $13.13 NA <br />Operating Cost/Hour: $23.49 100 <br />Operator Cost/Hour: $38.49 NA <br />Total Unit Cost/Hour: $75.10 <br />Total Fleet Cost/Hour: $75.10 <br />MATERIAL OUANTITIES <br />Initial volume: 400 CCY Swell factor: 1.000 <br />Loose volume: 400 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Loader Cycle Time: Unadjusted Basic Cycle Time (load, dump, maneuver) <br />0.500 <br />minutes <br />Cycle Time Factors Factor (min.) Source <br />Material: Mixed material 0.02 0.020 (Cat HB) <br />Stockpile: Dumped by truck 0.02 0.020 (Cat HB) <br />Truck Ownershi : Common ownership of trucks and loaders -0.04 -0.040 (Cat HB) <br />Operation: Constant operation -0.04 -0.040 (Cat HB) <br />Dump Target: Small target 0.04 0.040 Cat HB <br />Net Cycle Time Adjustment: <br />Adjusted Basic Cycle Time: <br />0.000 <br />0.500 <br />minutes <br />minutes <br />Rolling Resistance - Road Conditions <br />Haul: Firm, smooth, rolling, dirt/lt. surfaced, watered, maintained 3.0 <br />Return: Firm, smooth, rolling, dirt/lt. surfaced, watered, maintained 3.0 <br />Haul and Return Time <br /> Length <br />(feet) Grade Res. <br />(%) Rolling <br />Res. (%) Total Res. <br />(%) Travel Time <br />(minutes) Source <br />Haul Route: 108 0.00 3.00 3.00 0.0609 (Cat HB) <br />Return Route: 108 0.00 3.00 3.00 0.0609 (Cat HB) <br />Permit/Job#: P2011001 <br />Abbreviation: None <br />Filename: P001-002 <br />CIRCES Cost Estimating Software
The URL can be used to link to this page
Your browser does not support the video tag.