Laserfiche WebLink
MR-418 Calculations <br /> Structure: D5E-2-#3 <br /> w/Freeboard <br /> (ft.) <br /> Manning's Coefficient(n) 0.017 <br /> Top Width(T) 5.79 <br /> Bottom Width(b) 0.00 <br /> Depth(h) 1.45 <br /> z(ft.) 2.00 <br /> Area(ft) 4.20 <br /> Wetted Perimeter(ft.) 6.48 <br /> Hydraulic Radius(ft.) 0.65 <br /> Slope(ft./ft.) 0.032 <br /> Maximum Flow(cfs) 49.29 <br /> Design Discharge(cfs) 26.49 <br /> Combined Flow 29.24 <br /> (D5E-2 Design Flow+C5E-25 Design Flow) <br /> Maximum Flow>Combined Flow? Yes <br /> Structure: C5E-4-24" HDPE-Stand Alone#1 <br /> Manning's Coefficient(n) 0.012 <br /> Inside Diameter(in) 19.5 <br /> Radius(in) 9.75 <br /> Area(ft) 2.07 <br /> Hydraulic Radius(ft.) 0.41 <br /> Slope(ft./ft.) 0.03 <br /> Maximum Flow(cfs) 24.45 <br /> Design Discharge(cfs) 21.35 <br /> Combined Flow 24.10 <br /> (C5E-4 Design Flow+C5E-25 Design Flow) <br /> Maximum Flow>Combined Flow? Yes <br /> 4 of 5 8/23/2016 <br />