Laserfiche WebLink
MR-418 Calculations <br /> Structure Name C5E-25 <br /> SEDCAD Structure# 67 <br /> Size(in) 12 <br /> Material HDPE <br /> Length(ft.) 320 <br /> Slope(%) 35 <br /> Manning's n 0.0130 <br /> Design Discharge(cfs) 2.75 <br /> Summary of Results <br /> Design Discharge Combined Maximum <br /> Structure Structure# Design Discharge Discharge of <br /> C5E-25 Discharge Structure <br /> D5E-6 13 3.96 2.75 6.71 22.18 <br /> C5E-7 Stand Alone#1 13.7 2.75 16.45 28.38 <br /> D5E-4 6 15.95 2.75 18.7 38.82 <br /> C5E-6 Stand Alone#1 15.95 2.75 18.7 24.45 <br /> D5E-3 #4 20.34 2.75 23.09 44.88 <br /> D5E-2 #3 26.49 2.75 29.24 49.29 <br /> C5E-4 Stand Alone 91 21.35 2.75 24.1 24.45 <br /> C5E-3 #17 21.6 2.75 24.35 31.56 <br /> C5E-2 Stand Alone#1 21.6 2.75 24.35 24.45 <br /> Manning's Equation for Gravity Flow <br /> 1.49 * a * i <br /> Q = n R <br /> Structure: D5E-6-#13 <br /> w/Freeboard <br /> (ft.) <br /> Manning's Coefficient(n) 0.017 <br /> Top Width(T) 4.12 <br /> Bottom Width(b) 0.00 <br /> Depth(h) 1.03 <br /> z(ft.) 2.00 <br /> Area(ft) 2.12 <br /> Wetted Perimeter(ft.) 4.61 <br /> Hydraulic Radius-R(ft.) 0.46 <br /> Slope-S(ft./ft.) 0.04 <br /> Maximum Flow-Q(cfs) 22.18 <br /> Design Discharge(cfs) 3.96 <br /> Combined Flow 6.71 <br /> (D5E-6 Design Flow+C5E-25 Design Flow) <br /> Maximum Flow>Combined Flow? Yes <br /> 1 of 5 8/23/2016 <br />