My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-11-19_PERMIT FILE - C1992081A (3)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1992081A
>
2010-11-19_PERMIT FILE - C1992081A (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:27:08 PM
Creation date
3/23/2011 10:00:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081A
IBM Index Class Name
Permit File
Doc Date
11/19/2010
Section_Exhibit Name
Tab 12 Facilities
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TR-06) not needed for the unloading system that will be demolished and properly disposed. <br />The railcar unloading handling system will consist of a train dump hopper (new), a reclaim <br />tunnel and belt conveyor (new) and a radial stacker (new) to unload rail cars. These three <br />components were included in the unloading system approved under TR-05. However, the <br />structures constructed to support the 2NIlrI ton/year unloading operations plan will be <br />slightly larger to handle the increased throughput, and the train dump hopper will be <br />enclosed in a fabricated, metal building. The existing truck dump hopper and belt conveyor, <br />existing crusher building (refurbished), an existing reclaim belt conveyor (refurbished and <br />relocated) and the existing loading building (refurbished and relocated) will be used to <br />load tandem-trailer bottom dump trucks for coal haulage to the Hayden Station Power Plant . <br />See Exhibit 12-1, (Revision 14, dated 03/07), Exhibit 12-1A, Train Unloading and Truck <br />Loading Facilities Plan and Sections, and Exhibit 12-2 (Revision 11, dated 03/07) for <br />anticipated locations and layout of the proposed coal handling facility. <br />Railcar Unloading Facility: The rail car unloading hopper will be located slightly west of <br />the existing train loadout structure location. The hopper will be enclosed in a fabricated, <br />metal building. The hopper will be able to accommodate up to approximately 275 tons of <br />coal. Coal from the hopper will be transferred to a reclaim conveyor by a 118-inch belt <br />feeder located below the hopper. <br />Dust control for the proposed coal handling system will be by FogJeta'' System (Raring <br />Corporation, Vancouver, Washington), or equivalent. Anew building will be constructed near <br />the existing water tank to house the FogJetTM dust control system. <br />Reclaim Tunnel and Conveyor: A 60-inch wide reclaim belt conveyor will be housed in an <br />inclined (16.5°) concrete tunnel perpendicular to the railroad tracks. The reclaim belt <br />conveyor will transport coal (4,000 tons per hour) to the radial stacker. <br />Radial Stacker: The radial stacker will be a 54-inch wide by 125-feet long self-propelled <br />rubber tired unit. The stacker will be capable of adjusting the dump height to minimize <br />dust, and will slew through 160 degrees on a concrete runway. <br />Coal Storage: The coal storage pile will be kidney shaped and approximately 30 feet maximum <br />height. The stockpile will be capable of storing a maximum of 30,000 tons of coal. Tracked <br />dozers will be used to push coal from the stockpile to the dump hopper which feeds the truck <br />loading facility. <br />MR-16 16 Revised Y1/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.