Laserfiche WebLink
March 17,2011 C-1983-059/Terror Creek Loadout JJD <br /> REVEGETATION—Rule 4.15 F,[]Vegetative Cover;Timing: <br /> The revegetated portions of the disturbed area had a good cover of grass.No erosional problems were <br /> noted. <br /> SUPPORT FACILITIES -Rule 4.04: <br /> No problems were noted with any of the coal handling and coal processing facilities.The coal unloading, <br /> crushing/screening and railcar loading operations were in progress during the field inspection.No problems were <br /> noted at the material storage area,electrical substation,material storage area, loadout office and weigh station. <br /> There was a small break in the water line that was bringing water to the water tank but the operator was working <br /> on the repair.There were no leaks at the fuel facility. <br /> SIGNS AND MARKERS—Rule 4.02: <br /> The mine identification signs were up at the main entrance,east entrance and adjacent to the road that <br /> leads to the railroad tracks.The required information was on each sign. Permit boundary markers were up around <br /> the permit area. <br /> TOPSOIL—Rule 4.061 _Removal 4.06.2; Substitute Materials 4.06.4(4); Storage and Protection 4.06.3; <br /> Redistribution 4.06.4: <br /> The west side topsoil stockpile had a good vegetative cover.The stockpile was stable with no signs of <br /> erosional problems. The topsoil sign was up on the stockpile.The collection/diversion berm was in place.The <br /> topsoil stockpile on the east side of the loadout also was stable.The collection and diversion ditches associated <br /> with this stockpile were well grassed and had sufficient capacity. The topsoil sign was up on this stockpile as well. <br /> SEALING OF DRILLED HOLES AND UNDERGROUND OPENINGS—Rule 4.07 <br /> RECLAMATION PLAN COMPLIANCE—Rule 4.13 <br /> DOCUMENTS RECEIVED-None <br /> OTHER(SPECIFY) <br /> Number of Partial Inspection this Fiscal Year: 6 <br /> Number of Complete Inspections this Fiscal Year: 3 <br /> Page 3 of 4 <br />