My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-01-18_REVISION - C1992080
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1992080
>
2007-01-18_REVISION - C1992080
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:16:33 PM
Creation date
3/17/2011 9:38:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992080
IBM Index Class Name
REVISION
Doc Date
1/18/2007
Doc Name
Adequacy Review
From
Savage & Savage
To
DRMS
Type & Sequence
SL3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Savage and Savage Environmental <br />practical solutions for environmental issues <br />4610 Haystack Drive 970 674 8080 telephone <br />Windsor, Colorado 80550 970 674 8088 facsimile <br />savageandsavage(pearthlink.net <br />January 17, 2007 <br />Tom Kaldenbach <br />Colorado Division of Reclamation, Mining and Safety <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />REC EVED <br />JAN 16 2007 <br />Division of r: , V,. <br />Mining and Safetyon <br />RE: Re: Carbon Junction Mine, DMG Permit C-92-080 Bond Release Application SL-3 <br />Technical Adequacy Review <br />Dear Tom: <br />With this correspondence we are providing a response to the items contained in your <br />January 5, 2007 technical adequacy review for bond release application SL-03 (Final <br />Reclamation Phase I) at the Carbon Junction Mine. For ease of review I have reiterated <br />the adequacy issues prior to our response. <br />1. Please submit the map referred to on page I of the bond release application as <br />"Carbon Junction Mine. Final Reclamation Phase I Bond Release Areas': It was not <br />included with the application. <br />Two copies of the map Carbon Junction Mine: Final Reclamation Phase I Bond Release <br />Areas are attached. <br />2. Please submit a P.E-certified as-built design for the reconstructed Carbon Junction <br />channel, including the two new culverts. Please submit the design as a Minor Revision <br />to the permit application if the as-built is not significantly different from the original <br />design, or as a Technical Revision if the as-built is significantly different from the <br />original design- <br />Goff Engineering and Surveying has been contacted to prepare the as-built drawings for <br />the Carbon Junction channel. As soon as that information is available it will be submitted <br />to the Division in the appropriate revision format. <br />Carbon Junction Mine Page 1 <br />5L-03 Technical Adequacy Review Response <br />
The URL can be used to link to this page
Your browser does not support the video tag.