Laserfiche WebLink
Michael S. Savage <br />January 5, 2006 <br />Tasks 38, 39, and 41- These tasks remain obligations of the permittee <br />as they were not absorbed by the gravel pit (Amendment AM-01 of the <br />gravel permit was withdrawn). The reclamation tasks remaining for the <br />gravel pit are shown in the enclosed gravel pit inspection report and cost <br />estimate. The coal mine draft estimate includes Task 38 (hauling <br />residual topsoil from stockpiles #4 and #7 into the gravel pit area) only <br />to account for removing the hills of topsoil in order to achieve <br />approximate original contour. The gravel pit's approved reclamation <br />plan may need approval of a revision before that topsoil can be placed <br />on the gravel pit's recently reclaimed lands. Discing of stockpiles #3, <br />#7, and #8 (Task 39) is assumed to be needed for the same reason that <br />discing is required for stockpile #2 (page 5-36 of the reclamation plan). <br />Page 3 <br />Please call me if you have further questions or would like a meeting to discuss the draft <br />estimate. <br />Sincerely, <br />%'", /< r4 <br />Tom Kaldenbach <br />cc: Dan Hernandez