Laserfiche WebLink
CIRCES Cost Estimatina Software <br />BULLDOZER RIPPING WORK <br />PROJECT IDENTIFICATION <br />Task #: 024 State :Colorado Permitrob # : C-1982-057 <br />Date : 031152010 County :Routt Abbreviation :none <br />User : JRS Site : Seneca ft-W Filename : C057-024 <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action : Partial Phase I Bond Release SL-02 <br />Task description :Rip Permanent Roads <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat DI IR - 11U (2005) Horsepower : 850 <br />Blade type : Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br />Data source : (CRG) <br />Utilization % <br />Cost Breakdown : Ownership cost/hour : $173.03 NA <br />Dozer operating cost/hour : $209.76 100 <br />Ripper operating cost/hour : $12.25 100 <br />Operator cost/hour : $38.54 NA <br />Total unit cosUhour : $433.58 Total fleet cost/hour : $1,734.31 <br />47 <br />MATERIAL tlUANTITIES <br />Selected estimating method : Area <br />Alternate methods - <br />Seismic : NA NA Load factor : NA <br />Area : 16.70 acres Rip depth (ft) : 3.00 <br />Source of estimated quantity :Page 25-1-19 <br />Source of estimated load factor :NA <br />HOURLY PRODUCTION <br />Alternate methods - <br />Seismic : Seismic velocity : NA feetisecond <br />Unadjusted production : NA cu. yds./hour <br />Unadjusted production <br />per selected method : 6,286.32 cu. yds./hour <br />Area : Avg. ripping depth : 3.51 feet/pass Site altitude : 7,500 feet <br />Average ripping width : 9.83 feet/pass Altitude adjustment : 1.00 (Cat HB) <br />Average ripping length : 300.00 feet/pass Job efficiency factor : 0.83 (1 shift/day) <br />Average dozer speed : 88.00 feetiminute Net job correction : 0.83 multiplier <br />Average maneuver time : 0.25 minutes/pass <br />Production per unit area : 1.110 acres/hour Adjusted unit production : 5,217.64 cu. yds./hour <br />Unadjusted production : 6,286.32 cu. yds./hour Adjusted fleet production : 20,870.57 cu. yds./hour <br /> <br />JOB TIME AND COST <br />Fleet size : 4 dozers) Total job time : 3.87 hours <br />Unit cost : $0.083 per cu. yd. Total job cost: $6,717 <br /> - - <br />Bank volume : NA BCY <br />Volume : 80,828 BCY or CCY