My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-03-16_REVISION - C1982057
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1982057
>
2011-03-16_REVISION - C1982057
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:31:48 PM
Creation date
3/16/2011 1:20:34 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
REVISION
Doc Date
3/16/2011
Doc Name
Reclamation Cost Estimate (Memo)
From
Jim Stark
To
Susan Burgmaier
Type & Sequence
SL3
Email Name
SLB
JRS
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimatina Software <br />BULLDOZER WORK <br />, ; - _ _ ? - --- 77757-1 1 _- <br />07 <br />4 .. _. ... _. ...._. __ .... _ -._....._.?....rL- ..?. tea.-.?.»? ?__: _ ... ... .e -._... .. ... _..,_ <br />PROJECT IDENTIFICATION <br />Task #: 015 State :Colorado Permit/job# : C-1982-057 <br />Date : 0311512010 County :Routt Abbreviation :none <br />User: JRS Site :Seneca 11-WMine Filename :C057-015 <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action : Partial Phase / Bond Release SL-02 <br />Task description : Grade Facilities Area Surface Material Into Fill <br />HOURLY EQUIPMENT COST -? <br />Basic machine : Cat D11R - 11 U (2005) Horsepower : 850 <br />Blade type : Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 1 per day <br />Attachment no. 2:3-shank ripper <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $174.21 NA <br /> Operating costlhour : $209.76 100 <br /> Ripper op. cost/hour : $0.00 0 <br /> Operator cost/hour : $38.54 NA <br /> Total unit cost/hour : $422.51 Total fleet cost/hour : $1,690.03 <br /> <br /> <br />MATERIAL t?UANTITIES <br />Initial Swell Loose <br />volume : 28,233 LCY factor : NA volume : 28,233 LCY <br /> <br />Source of estimated volume : Division Estimate <br />Source of estimated swell factor : NA <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 100 feet Material consistency : 0.80 (Cat HB) <br />Unadjusted hourly production : 2,870.3 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility: 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (lshift/day) <br />Dry, non-cohesive Spoil pile : 0.80 (fnd-rf) <br /> Push gradient : 1.00 (Cat 1-18) <br />Average push gradient : 0.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 7,200 feet Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2550 Ibs/LCY Net correction : 0.36 <br />Weight description <br />Gravel - Dry <br />JOB TIME AND COST <br />Adjusted unit production <br />Adjusted fleet production <br />Fleet size : 4 Dozen(s) Total job time : <br />Unit cost : $0.410 /LCY Total job cost : <br />1031.04 LCY/hr <br />4,124.18 LCY/hr <br />6.85 Hours <br />$11,569
The URL can be used to link to this page
Your browser does not support the video tag.