My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-11-16_PERMIT FILE - C1996083A (28)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083A
>
2010-11-16_PERMIT FILE - C1996083A (28)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:27:00 PM
Creation date
3/16/2011 8:24:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
11/16/2010
Section_Exhibit Name
Volume IIIA Exhibit 15 Subsidence Prediction
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Subsidence Handbook Volume III, Exhibit 15 <br />• ROADS AND TRAILS <br />Introduction <br />Various access trails have been constructed for past exploratory drilling and existing <br />hunting use. These trails are not surfaced and have limited access to traffic. The trails are <br />used for continued monitoring of environmental resources. <br />Worst-Case Damage <br />A subsidence crack could develop along trails and light use roads, causing a hazard to <br />traffic. Large rocks could fall or roll onto trails and light use roads causing temporary <br />closure of the roads or tails and posing a hazard to traffic and personnel. <br />Pre-Damage Monitoring <br />Bowie Resources will monitor conditions of low-traffic trails as persons travel on unusual <br />environmental resource monitoring. Any problems will be noted and documented in the <br />"Annual Subsidence and Hydrology Report". <br />Any subsidence-induced problems identified by the trail users will be documented. The <br />vast majority of trails have been constructed and are used by Bowie Resources. This is <br />especially true in the first permit term. <br />Post-Damage Monitoring <br />Post-Damage monitoring will be conducted like pre-damage monitoring. <br />Mining Techniques <br />Longwall or conventional room-and-pillar mining with pillar extraction will be used <br />throughout the permit area. This will have little effect on access trails. <br />Repair Procedures <br />Repairs will be completed by appropriate earth-moving equipment when damage occurs. <br />Typically, the trails are maintained on an annual basis, as required, to access <br />• environmental resource monitoring. Rockfall will be removed from roads and trails as soon <br />TR 3 I 43 02/04 <br />~ pP~o uED s~r~~o y <br />
The URL can be used to link to this page
Your browser does not support the video tag.