My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-11-16_PERMIT FILE - C1996083A (26)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083A
>
2010-11-16_PERMIT FILE - C1996083A (26)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:27:00 PM
Creation date
3/16/2011 8:24:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
11/16/2010
Section_Exhibit Name
Exhibit 01 Coal and Water Rights
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JAN. -06' 04 (TUE) 08 ~ 3l P. 009 <br />4 • <br />the Dam Safety Engineer, Colorado SL-ate Engineers Of Pica, Water D7.vislon 4 and <br />appropriate afY.ected parties. <br />(CI Existing Forest Service awned or permitted surface improvements wi.l.l need <br />to be protected, restored or replaced to provide for continuance of currenC land <br />uses. With spBCific regard r_o rtte Aruce park Reservoir and dam, should structural <br />damage result from mining-related activities, the lessee shall be responsible for <br />damage repair and compensation to she injured party or parties. <br />(D7 The structuraa. integriL-y of the coal in the chain and barrier pillars <br />under Terror and Hubbard Creeks shall be designed and maintair_ed for long term <br />support. Packfill.ing or structural supports may be rerg.aired to ac7pieve long term <br />support under cha creeks and the structure upon retreat mining, P. pillar sL'ablli.ty <br />analysis shall be used co design chain or barrier pillars for long term structural <br />integrity where needed [o protect surface resources. <br />(g) Transnortacion of Coat, The lessee will have thirty (30) months from the <br />date o£ lease issuance to obtain alternative means for transporting the coal from <br />the mine to the rail Ioadout. after [hat date, no .federal coal from the lease wall <br />be transported via rruck on State Highway 133 with the exception of speciaa.ty coal <br />and instances of force majeure. In cases of force majeure, the lessee must obtain <br />approval of the authorized officer. <br />(h) S,7 rface Di ~rv~~ina cL•ivit'-s. Any surface diaturhance related to <br />installation of degasif ication boreholes, Vontila Lion shafts, drill holes or any <br />other surface-disturbing activity must be approved by the surface management agency. <br />The lessee/operator will ba rasnonsihle Ycr soil preservation/protection and final <br />raelamat.ion. For reclamation that would require reseeding, a certified weed Prea <br />source of seed would be used. The lessee will be responsible for controlling spread • <br />of, and eradicating noxious weeds. <br />(il Additional Scinulations fob Foresr Service a,Dds. (17 Mininy that would <br />cause subsidence will not be permitted under perennial portions oP Terror Creek, <br />Hubbard Creek and Dove Gulch. Further, mining that would cause subsidence will not <br />be permitted within a zone under L•hese drainages created by projecting a 25 degree <br />angle of draw (from vertical) from the surface expression of the cree]<s down to the <br />Cop of the coal seam to be mined. <br />(2) SpeCi.f is approval w111 be required for locating drill sites, degasification <br />boreholes or ventilation shafts o.r any other surface distuYbances (if they are <br />noeded7 in areas of moderate geologic hazards and on slopes ranging from '1D to 60 <br />percent. <br />(3) Drill sites, degasification boreholes, ventilation shafts or any other <br />surface disturbances will not be located on slopes in excess of b0 percent, or in <br />areas of high geologic hazard. <br />(A) No surface occupancy or use will apply to all wetlands, floodplains and <br />riparian areas Ori the Ndtlonal^orest, <br />(57 With regard to protecting elk on the winter range dur_ng calving season, <br />and minimizing surface damage, no surface use (explorarior., drilJ.ir_g and develonmeac <br />activity) will be allowed from Daoembar 1 co June 15. <br />(67 IE new road across is required for the construction of degasiEication <br />boreholes or ventilation shafts, accesses will be obliterated. until obliteration, <br />all new access will be closed to the public. <br />(71 Lands contained within tiais lease are subject co the ?orest service Interim <br />a~~lo, ldminisrration of the Forest Service Development Transportation System: <br />Temporary Suspznsion of Road Constn., c: Lion and RecOrietructJ on is Lktroodcd AroaoO; <br />paderal Barrister/Vol. 64. No. 29/Nr.i.day, b'ebruary 12, 1999, pages 7290 through 7305. • <br />These lands will also L-e subjzcC to the final. road management aolicy which will be <br />sec within 10 months. No road construction will be allowed within the unroaded area <br />until the Forest service adopts its revised road management policy or iB months from <br />the affective dace of this final interim Yule, whichever is seener. <br />
The URL can be used to link to this page
Your browser does not support the video tag.