Laserfiche WebLink
Topsoil Thickness <br />The thickness of topsoil replaced during 2010 was located north of BB Road and verified <br />is by the soil survey to approximate 1.9 feet (23 inch) depth. Sample sites for the New <br />Horizon 2 mining area were selected systematically utilizing a 465 foot by 465 foot grid <br />pattern. Sites at New Horizon 2 were determined from CAD drawings using distances and <br />azimuths from established survey points and located in the field by a survey grade GPS <br />unit. <br />• <br />• <br />A backhoe excavated the entire soil strata. An abrupt boundary, defined bycolorand rock <br />fragment content, typically occurred at the soil/spoil interface. The replaced soil thickness <br />was measured on the cut bank. PR-06 received approval in late 2010; thus changing <br />various topsoil and subsoil sampling requirements and can be viewed in PR-06, <br />2.05.4(2)(d). <br />Soil thickness as determined by past sampling is shown on Exhibit 2010-6. New Horizon 2 <br />has several different soil thickness requirements and is noted on Map 2.05.4-4 in section <br />2.05(2)(d) of the current Permit C-81-008 and is noted on Exhibit 2010-6. <br />Topsoil Salvage and Stora ge <br />All suitable soil has been salvaged ahead of mining at New Horizon 2. <br />volumes for all stored top soil are expressed in cubic yards. <br />Soil Type Stockpiled Required Balance <br />• Pre 1995 LIFT 1 10,590 200 10,390 <br />• Pre 1995 LIFT 2 41,760 400 41,360 <br />• Pre 1995 MIXED 66,025 43,125 22,900 <br />• Mixed-Zone 7 51,097 69,072 (-17.975) <br />Total of NonMorgan soil stockpiled 56,675 <br />• Morgan Lift A 185,128 108,592 76,536 <br />• Morgan Lift B 345,868 277,278 68,590 <br />• Morgan Mixed 132,271 122,994 9,277 <br />Morgan Soil Totals 663,267 508,864 154,403 <br />The approximate <br />Exhibit 2010-10 gives details on locations, types, volumes, and stockpile identification. <br />The soils were stockpiled separately by soil types and property ownership as specified by <br />our permit. <br />Cover Crop <br />All topsoil stockpiles in the prime farmland area were hydro-seeded with the approved <br />temporary seed mix #3. During this application, organic based mulch and tacktifier were <br />applied to aid in dust and erosion control as well as providing a seed bed for better <br />germination. Ponds 009, 011, 012, and, 013 were broadcast seeded with mix #3 as was <br />their associated ditches. The OB1 stockpile near Pond 012 was broadcast seeded with <br />mix #3, as was a section of Mt. Nucla that was disturbed during reclamation activities. <br />Several other areas were seeded to the temporary mix due to the late approval of PR-6. <br />• 8.2 acres of mix #3 and winter wheat were applied at 22.5 PLS/ac and 35 Ibs/ac <br />respectively were completed on the Prime Farmland area. <br />F:\Eng\DATA\Word\Ann Reclaim Report\2010\2010RECRPT.doc 3