• <br />• <br />• <br />Exhibit L <br /> Protected Climax <br />Bldg # Faclll Desl nation Dimensions Material Volume / Sim Unit Costs Estimated/ <br /> Actual Cost <br />101 60 CONVEYOR - conveyor elevated 3501 X 12'W X 121H STEEL 350 LIN.FT. Demo Com lets <br />101 61 CONVEYOR - wnve or elevated 420'1 X 15W X 15'H STEEL 420 LIN.FT. Demo Complete <br />101 63 CONVEYOR - conv or elevated 5001 X 15W X 15W STEEL 500 LIN.FT. - Demo Complete <br />101 67A CONVEYOR - conveyor elevated 10501 X 12W X 12'H STEEL 1050 LIN.FT. Demo Complete <br />101 678 CONVEYOR - conveyor elevated 10501 X 12W X 12'H STEEL 1050 LIN.FT. Demo Complete <br /> MILL UTILITY TRESTLE - elevated 4501 X 12W X 121H STEEL 450 LIN.FT. Demo Complete <br /> CONVEYOR FOUNDATION - assume 4079-L X 2W X 37 CONCRETE 24474 cu ft Demo Complete <br /> 0.51.ft. footing -for each I.A. conveyor <br /> Climax's Estim ated Conveyor R emoval Total Co st = $ <br /> <br />Notes: The Climax Method accepts the DMG's figures for demolition on grade, and for elevated conveyors uses a figure of 25% additional cost (verified by Steve Thomas of <br />Wayne Gomez Demolition and Excavating, 11-11-97) for shearing the supports to get conveyor on the ground. For instance, DMG's cost estimate for an 18 x 18 conveyor on <br />grade is $60.75 per foot. The Climax method accepts this number and adds 25% due to the fact that the conveyor is elevated. The resultant cost per foot is $60.75 x 1.25 = <br />$75.94. Unit costs were inflated to 2010 dollars using the CPI ratio. The figure for concrete demolition comes from experience at Horizon and Climax Storks Areas, where the <br />old explosive sheds (2 ft thick steel and re-bar) were demolished at a cost of $0.37 / cu ft. It was inflated to 2010 dollars using the CPI ratio. <br /> <br /> Bone Yard Demolition <br /> <br /> OP PIT FIRE PLGS SHP- misc. non-haz. debris 201 X 20W X 5'H COMBINATION 2000 CU.FT. $0.13 $ 260 <br /> OP PIT FIRE PLGS SHP- misc. non-haz. debris 201 X 20W X 5'H COMBINATION 2000 CU.FT. $0.13 $ 260 <br /> OP PIT FIRE PLGS WSH- misc. non-haz. debris 20-L X 20W X 5'H COMBINATION 2000 CU.FT. $0.13 $ 260 <br /> OP PIT FIRE PLGS WSH- misc. nan-haz. debris 20'1 X 20W X 5'H COMBINATION 2000 CU.FT. $0.13 $ 260 <br /> OPEN PIT DOCKS on-haz. debris <br />s 220'1 X 10W X 5'H COMBINATION 11000 CU.FT. $0.13 $ 1,430 <br /> IRECO PLNT FOUNDTN i <br />misc. non-haz. debris 35-L X 35W X 5'H COMBINATION 6125 CU.FT. $0.13 $ 796 <br /> IRECO PLNT FOUNDTN 2- misc. non-haz. debris 25'L X 20W X 5'H COMBINATION 2500 CU.FT. $0.13 $ 325 <br /> RECO FLINT FOUNDTN 3- misc. non-ham debris 251 X 20W X 5'H COMBINATION 2500 CU.FT. $0.13 $ 325 <br /> IRECO PLNT FOUNDTN 4- misc. non-haz. debris 254L X 40W X 5'H COMBINATION 5000 CU.FT. $0.13 $ 650 <br /> CORE BLDG FOUNDATION- misc. non-haz. debris 120'1 X BOW <br />X 5'H COMBINATION 48000 CU.FT. $0.13 $ 6,240 <br /> NO 2 ELECTRIC EAST - mis7 non-haz. debris _ <br />100'L X 30W X 5'H COMBINATION 15000 CU.FT. $0.13 $ 1,950 <br /> NO 2 ELECTRIC WEST - misc. non-haz. debris 72'L X 33W X 5'H COMBINATION 11880 CU.FT. $0.13 $ 1,544 <br /> I/R BLDG FOUND COVER- misc. non-haz+ debris 150'L X 150W X 5'H COMBINATION 112500 CU.FT. $0.13 $ 14,625 <br />As 0f 8-26-08 BULK YARD - misc. non-haz. debris 15001 X 80OW X 5'H COMBINATION 6000000 CU.FT. See Next Line Item <br />Demo'd BULK YARD a.k.a. "NORTH FORTY YARD' Storage areas vary COMBINATION 1133900 CU.FT. $0.13 Demo Complete <br /> NO 6 CR ORE PILE GRD- misc. non-haz. debris 400'L X 40OW X 5'H COMBINATION 800000 CU.FT. $0.13 $ 104,DOO <br /> MCNULTY GL PIPE MATL- misc. non-haz. debris 501 X 251N X 5'H COMBINATION 6250 CU.FT. $0.13 $ 813 <br /> KOKOMO PIPE SUPPLIES- misc. non-haz. debris 50'L X 25W X 5'H COMBINATION 6250 CU.FT. $0.13 $ 813 <br /> <br /> Substations and Utility Lines <br /> <br /> MAYFLOWER PUMP SUB -SUPERSTRUCTURE 1101 X 100W X 15'H STEEL 165000 CU.FT. $0.13 <br /> " - FLOOR 87 wtwire mesh 1101 X 100W CONCRETE 11000 SQFT. Intl above <br /> <br /> MAYFLOWER SWITCHYARD - SUPERSTRUCTURE 85'L X 55W X 15'H STEEL 70125 CU.FT. $0.13 <br /> ' - FLOOR BT wtwire mesh 85'L X 55W CONCRETE 4675 SOFT. Intl above <br /> <br /> P235 SUBSTATION -SUPERSTRUCTURE 201 X 26W X 15'H STEEL 7800 CU.FT. $0.13 Demo Complete <br /> " - FLOOR 87 w/wire mesh 20'L X 26W CONCRETE 520 SOFT. Ind above <br /> <br /> 3 MILL SUBSTATION - SUPERSTRUCTURE 1551 X 30W X 151H STEEL 69750 CU.FT. $0.13 $ 9,068 <br /> ' - FLOOR 8T w/wire mesh 155'L X 30W CONCRETE 4650 SQ.FT. Ind above <br /> <br /> 37 CONV SUBSTATION - SUPERSTRUCTURE 351 X 29W X 15-H STEEL 15225 CU.FT. $0.13 Demo Complete <br /> ' - FLOOR 8T Wwire mesh 351 X 29W CONCRETE 1015 SQFT. find above <br /> <br /> NO 2 MILL SUB YARD - SUPERSTRUCTURE 56'L X 40W X 15-H STEEL 33600 CU.FT. $0.13 Demo Complete <br /> ' - FLOOR BT W.I. mesh 561 X 40W CONCRETE 2240 SQFT. Ind above <br /> <br /> 2 CRUSHER DUCON SUB- SUPERSTRUCTURE 15-L X 12W X <br />15'H STEEL 2700 CU.FT. $0013 Demo Complete <br /> ' " "- FLOOR 87 wtwire mesh _ <br />15'L X 12W CONCRETE 180 SQ.FT, !net above <br /> <br /> OPEN PIT SHOP SUB - SUPERSTRUCTURE 25-L X 25W X 15'H STEEL 9375 CU.FT. $0013 $ 14219 <br /> ' - FLOOR 87 w/wire mesh 25'L X 25W CONCRETE 625 SQFT. Ind above <br /> <br /> ROBINSON PUMP SUB - SUPERSTRUCTURE 25'L X 25W X 15'H STEEL 9375 CU.FT. $0.13 $ 1,219 <br /> " - FLOOR 87 w/wire mesh 25'L X 25W CONCRETE 625 SQFT. ind above <br /> <br /> 4 DAM SUBSTATION - SUPERSTRUCTURE 25'L X 25W X 15'H STEEL 9375 CU.FT. $0.13 Demo Complete <br /> ' - FLOOR 87 wtwire mesh 251 X 25W CONCRETE 625 SQ.FT. Intl above <br /> <br />REMEABURED CHALK MOUNTAIN / ROBINSON LAKE SUB 201 X 8W X 8'H WOOD 1280 CU.FT. $0.13 $ 166 <br />m6a.8 POLE MOUNTED PLATFORM ON GROUND WOOD POLES ind above <br /> <br />REMEASURED CAVR SUBSTATION-SUPERSTRUCTURE WOOD 28-L X 20W X15'H WOOD 6400 CU.FT. $0013 $ 1,092 <br />8/26/2008 - FLOOR 1' THK w/wire mesh 101 X 20WX17HK CONCRETE 200 SQFT. Ind above <br /> <br />ADDED 8-26-08 OLD HOSPITAL SUB-SUPERSTRUCTURE WOOD 601 X 30W X8'H WOOD 14400 CU FT $0.13 $ 1,872 <br /> CONCRETE SLAB 44'L X 8'X 1' THICK CONCRETE Ind above <br /> <br />ADDED 8-26-08 DOMESTIC WATER SUB - WOOD STRUCTURE 20'L X 20W X 8'H WOOD 3200 CU FT $0.13 $ 416 <br /> CONCRETE SLAB 81 X 4W X V THK CONCRETE Ind above <br /> <br />ADDED s-26-06 IRECO PLANT SUB - SUPERSTRUCTURE 20-L X 20W X 8'H WOOD 3200 CU FT $0.13 $ 416 <br /> CONCRETE SLAB 12' X 12'X 0.5' THK CONCRETE Ind above <br /> <br />ADDED 8-26-08 OPEN PIT SW ITCHGEAR UNIT 161 X BW X 12'H WOOD 1536 CU FT $013 <br /> CONCRETE SLAB 6'L X 4W X 1' THK CONCRETE Intl above <br /> <br />ADDED 8s6-06 TAILING DELIVERY HOUSE SUBSTATION 81X 8W X 8'H WOOD 512 CU FT $0.13 $ 67 <br /> CONCRETE CONTAINMENT CELL 81 X 8W X 18"H CONCRETE ind above <br /> <br />ADDED 8-2648 MCNULTY SWITCHYARD 32'LX25WX25'H STEEL 20000 CU FT $0.13 <br /> CONCRETE PIERS AT BASE 4 EACH VARIES CONCRETE 128 CU FT Ind above <br /> <br />ADDED 8-z6-08 MCNULTV SUBSTATION 30'1 X 30W X 25'H WOOD 22500 CU FT $0.13 <br /> CONCRETE PIERS AT BASE 2 EACH VARIES CONCRETE 84 CU FT ind above <br /> <br />ADDED 8-26-08 WARREN'S PUMP STATION SUBSTATION 20'L X 16W X 8'H STEEL 2560 CU FT $0.13 <br /> CONCRETE CONTAINMENT CELL 16'LXI(W X 1' THK CONCRETE 160 SO FT ind above <br /> <br /> <br />See No.! Below STORKE UTILITY LINES-23 POLES/237'AVG <br />SPACING <br />5451 LIN. FT. <br />WOODANIRE <br />5451 <br />LIN.FT. <br />$ 0.78 <br />See No. 1 Below OPEN PIT UTIL LINES -21 POLES/2371AVG SPACING 4977 LIN. FT. WOODIWIRE 4977 LIN.FT. $ 0.78 $ 3,877 <br /> <br />See No. 1 Below MINEIMILL UTIL LINES-246 POLES/237'AVG <br />SPACING <br />58,302 LIN.FT. <br />WOODAVIRE <br />58302 <br />LIN.FT. <br />$ 0.78 <br />See No. i Below TAILING UTILITY LINE-25 POLES/237'AVG SPACING 5925 LIN. IT. WOODNVIRE 5925 LIN. FT. $ 0.78 $ 4,616 <br /> TOTAL THIS SP READSHE ET Demo 2 $ 644113 <br />Feb 2011