Laserfiche WebLink
Permit fiv-d.0 Climax Mine 0 <br />CLIMAX MINE RECLAMATION COST ESTIMATE <br />Financial Reoortina Unit Rates <br />3 Dam <br />Assumptions: <br />Tasks: <br />Grade area east of 3 Dam (C20) From previous state based estimate <br />Timing <br />2011+ <br />Total Cost <br />$2,498 <br />Calculations <br /> <br />TasklArea Initial <br /># of Equip Swell Factor Qty Units Production Units Hire Req'd Cost/Unit <br />Total Equip Cost Costfunit Total Labor Cost/Unit Total <br />Material <br />Total Cost <br /> Volume Equip Labor Cost Materials Cost <br />Grade area east of 3 Dam (C20) <br />CAT D7H 1 3,226 1.00 3,226 (cy) 222.21 (cy/hr) 14.52 $138.24 $2,007.20 $33.81 $490.85 $2,498.05 <br />6 Productivity based on grading for C77 C18 8 C19 $/analysis <br /> Hrs Req'd Total Equip Cost Total Labor Cost Total Material Ct Total Cost <br />TOTAL COSTS 15 $ 2,007 $ 491 $ $ 2;498 <br />Exhibit L Feb 2011