My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-03-01_REVISION - M1977493 (6)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977493
>
2011-03-01_REVISION - M1977493 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:47:16 PM
Creation date
3/11/2011 7:44:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
REVISION
Doc Date
3/1/2011
Doc Name
Response to DRMS Preliminary Review
From
Climax Molybdenum
To
DRMS
Type & Sequence
AM6
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Permit fiv-d.0 Climax Mine 0 <br />CLIMAX MINE RECLAMATION COST ESTIMATE <br />Financial Reoortina Unit Rates <br />3 Dam <br />Assumptions: <br />Tasks: <br />Grade area east of 3 Dam (C20) From previous state based estimate <br />Timing <br />2011+ <br />Total Cost <br />$2,498 <br />Calculations <br /> <br />TasklArea Initial <br /># of Equip Swell Factor Qty Units Production Units Hire Req'd Cost/Unit <br />Total Equip Cost Costfunit Total Labor Cost/Unit Total <br />Material <br />Total Cost <br /> Volume Equip Labor Cost Materials Cost <br />Grade area east of 3 Dam (C20) <br />CAT D7H 1 3,226 1.00 3,226 (cy) 222.21 (cy/hr) 14.52 $138.24 $2,007.20 $33.81 $490.85 $2,498.05 <br />6 Productivity based on grading for C77 C18 8 C19 $/analysis <br /> Hrs Req'd Total Equip Cost Total Labor Cost Total Material Ct Total Cost <br />TOTAL COSTS 15 $ 2,007 $ 491 $ $ 2;498 <br />Exhibit L Feb 2011
The URL can be used to link to this page
Your browser does not support the video tag.