My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-03-01_REVISION - M1977493 (6)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977493
>
2011-03-01_REVISION - M1977493 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:47:16 PM
Creation date
3/11/2011 7:44:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
REVISION
Doc Date
3/1/2011
Doc Name
Response to DRMS Preliminary Review
From
Climax Molybdenum
To
DRMS
Type & Sequence
AM6
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Permit Amle (AM-06) - Climax Mine 0 <br />CLIMAX MINE RECLAMATION COST ESTIMATE <br />Financial Reporting Unit Rates <br />Tenmile Tunnel Sealing + Bulkhead Construction <br />• <br />Assumptions: <br />(1) Cost of bulkhead work in 2003 and 2004 can be used to pro-rate costs for final closure; <br />(2) Tunnel will be maintained until closure such that it is accessible at least as easily as it is today; <br />(3) Hydrostatic pressures are such that a bulkhead at both ends + sludge and check dams in between will effectively "maintain" the integrity of the tunnel indefinitely; 220' head at <br /> closure per T. Rogers 2/8/2010. <br />(4) Even if it should collapse, the fact that drainage would be captured in the Climax Water Treatment System would prevent discharge of contaminated waters. <br />Tasks: <br />(1) Build bulkhead on north end of tunnel near opening to act as a dam; $80,000 per T. Rogers 2/8/2010. <br />(2) Pump tailing from Tenmile OSF into tunnel to accumulate against north bulkhead; <br />(3) Build 4 bulkheads at locations spaced approximately 2,000 ft apart to capture liquid sludge; $80,000 ea. per T. Rogers 2/8/2010. <br />(4) Continue pumping until tunnel will take no more sludge; <br />(5) Seal south end of tunnel with bulkhead; $80,000 per T. Rogers 2/8/2010. <br />Timing <br />End of Mine Life <br />Total Cost <br />$789,264 <br />Calculations <br />Task/Area Qty Units Adj Qty Units Total Equip Cost/Unit Total Labor Cost Cost/Unit Total Material Cost Total Cost <br />Cost Labor Materials <br />What is the length of the Tenmile Tunnel? 10,500 feet <br />What is the height of the Tenmile Tunnel? 10 feet <br />What is the width of the Tenmile Tunnel? 10 feet <br />Calculated Volume of the Tenmile Tunnel = 1,050,000 cu ft 38,889 cu yds <br />What is the length of a bulkhead plug for north end? 50 feet <br />Calculated volume of concrete to build plug = 185 cy <br />What is the length of a bulkhead plug for south end? 50 feet <br />Calculated volume of concrete to build plug = 185 cy <br />What was the total cost of bulkhead built in 2008? $ 90,000 <br />What was the length of the bulkhead built in 2003? 18 feet <br />Calculated cost per foot for 2003 bulkhead = $ 5,000 $/ft <br />Calculated unadjusted cost for closure bulkheads = $ 1,175,926 <br />Cost reduction expected based on better access? 50 % <br />Adjusted cost for closure bulkheads = $293,981 $146,991 $146,991 $ 587,963 <br />Check using concrete costs for work by Nielsons 2005 <br />What was the cost for concrete work at Robinson? $ 1,430 $/cy inflated to 2008 $ <br />Applying Nielsons cost to closure bulkheads = $ 529,702 by Nielsons for comparison to cal culated value <br />What is volume of Robinson Lake Sludge to Pump? 38,519 cy <br />What is cost per cu yd to pump sludge into tunnel? $ 6.60 $/cy inflated to 2008 $ <br />What is cost for mob & demob of dredging equipment? $ 55,008 inflated to 2008 $ <br />Calculated cost to dredge and pump sludge to tunnel = $ 254,257 <br />Total cost of dredge+pumping+mob/demob = $154,632 $77,316 $77,316 $ 309,264 <br />What is the estimated cost to build one bulkhead? $ 2,200 inflated to 2008 $ <br />What is the total number of bulkheads to build? 4 <br />Total cost of "check dams" _ $4,401 $2,200 $2,200 $ 8,801 <br /> Total Equip Cost Total Labor Cost Total Material Cost Total Cost <br />TOTAL COSTS $ 453,014 $' 226,507 $ 226,507 $ 789,264 <br />Exhibit L Feb 2011
The URL can be used to link to this page
Your browser does not support the video tag.