My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-03-01_REVISION - M1977227
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977227
>
2011-03-01_REVISION - M1977227
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:05:18 PM
Creation date
3/10/2011 8:39:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977227
IBM Index Class Name
REVISION
Doc Date
3/1/2011
Doc Name
Final Adequacy responses (TR-02)
From
MWCA, Inc.
To
DRMS
Type & Sequence
TR2
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
existing fines piles which would require resloping to 3:1 are shown by the <br />referenced map. <br />MWCA acknowledges there must be a permit as long as materials may be sold <br />from the site. MWCA confirms that at some point in the future, the company may <br />desire to transfer the permit to another party. <br />3 - After the concrete pad is broken, onsite material will be used to cap the area <br />and revegetate the footprint of the pad. The pad and walls will be broken by <br />mechanical means into 2 Foot Diameter or less pieces and buried nearby at a <br />depth of approximately 4 Feet. <br />Acknowledged, the capping which will be completed above the area where the <br />concrete pad and bins are currently located will be graded to conform to a <br />maximum slope gradient of 3:1. <br />4 - The overhead electric power lines and poles which extend into the site are <br />the property of San Luis Valley Electric Cooperative. The electrical power <br />infrastructure is considered an asset and MWCA does not intend to request its <br />removal. <br />Acknowledged, as shown by the referenced map. <br />5 - The seeding mix and rate will be the same as used elsewhere on the site. <br />Acknowledged <br />6 - The seeding has been finished. The conditions of the revegetation will be <br />monitored and the success will be reported in the annual reports. A Bamberg <br />Ecological memo dated June 4, 2010 describing the revegetation status in May <br />2010 is attached and will also be included in the next annual report. <br />Acknowledged, the site conditions and revegetation success will be reported in <br />the permit-required annual reports. <br />7 - The topsoil respreading task has been completed. A stockpile of <br />topsoil/growth material is located between the fines piles. This will be used to <br />complete a similar mosaic distribution of growth material for revegetation. <br />Acknowledged <br />8 - A stockpile of topsoil/growth material is located between the fines piles. This <br />will be used to complete a similar mosaic distribution of growth material for <br />revegetation. It is anticipated the piles would be revegetated using the same <br />seeding mix and rate as used elsewhere on the site.
The URL can be used to link to this page
Your browser does not support the video tag.