My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-03-08_REPORT - M1993030
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1993030
>
2011-03-08_REPORT - M1993030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2019 10:30:32 AM
Creation date
3/10/2011 7:24:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1993030
IBM Index Class Name
REPORT
Doc Date
3/8/2011
Doc Name
Annual Fee/Report/Map
From
Crystaljack Mining
To
DRMS
Permit Index Doc Type
Annual Fee/Report
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br />MINED LAND RECLAMATION BOARD 110(2) ANNUAL REPORT <br />For Season 2010 <br />CRYSTALJACK MINING <br />PERMIT NO. M-1993-030 <br />Prepared: 4 March 2011 <br />Submitted: 7 March 2011 <br />Summary: <br />We operated mechanized equipment on Crystaljack mining properties from 12 through 15 July to <br />complete reclamation on Qui-Buc No. 1. No production took place during 2010. No new sites <br />were opened during 2010. Unauthorized and unknown persons re-opened the access road to Qui- <br />Buc No. 4 and No. 6. This road had been considered 80% reclaimed. <br />Map Depicting Operations: <br />Attached are maps showing the ten claims covered under this permit, permit M-1993-030. The <br />maps show past excavations which have been reclaimed (green), currently open dig sites (shaded <br />orange) and proposed dig sites (either a blue button or a rectangle). <br />Current Disturbances (2010): <br />Site E, approximately 0.02 acre, was open at the beginning of 2010. It was closed and reseeded. <br />Reclamation Summary (Includes 2010 Reclamation): <br />Since this project began in 1993, approximately 4.54 acres have been excavated and reclaimed. <br />All newly reclaimed sites have been reseeded the same season. These sites are then planted with <br />trees the following season. Only Site 5 (Site E) on Qui-Buc No. 1, Site 7 on the Two Point and <br />recent prospects and reclaimed roads have less than 80 percent growth. <br />Reclamation Completed During 2010: <br />Site 5 (Site E) on Qui-Buc No. 5 was filled, recontoured, and reseeded (0.02 acre). The access <br />road to this site was removed, recontoured and reseeded. <br />Proposed 2011 Operations: <br />Operations will be in conjunction with operations on Colorado Calumet Company claims and <br />Glacier Peak Mining claims between early May through early August. Mechanized operations <br />will be limited to 10 working days on the Crystaljack claims. We will use a John Deere 992 <br />and/or 690 track hoe on the Two Point Claim at Site 6 and on the Qui-Buc No. 1 Claim at Site 13 <br />(Site N). The old access road to Sites on Qui-Buc No. 4 and Qui-Buc No. 6 will be closed by <br />installing berms at both ends since this road serves only reclaimed sites and has been closed by
The URL can be used to link to this page
Your browser does not support the video tag.