My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-03-02_PERMIT FILE - M2011017
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2011017
>
2011-03-02_PERMIT FILE - M2011017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:31:26 PM
Creation date
3/9/2011 8:55:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2011017
IBM Index Class Name
PERMIT FILE
Doc Date
3/2/2011
Doc Name
New 110c permit application
From
Breeze Basin Resources
To
DRMS
Email Name
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Routt County Planning Dept. Mineral Development Application Form <br />14. Hours of operation: 7 AM- 7 PM <br />a. Distance to surrounding homes: l mile <br />b. Potential noise from equipment/trucks/mining: L i m i t e d <br />15. Weed control during mining operation (submit plan for review and approval to Routt County Weed <br />Supervisor): See plan <br />1-6. Other permits: Division of Reclamation, Mining & Safety, 110 Permit <br />Reclamation Plan: <br />1. Sketch of existing and final contours, retaining wall(s) and other structures. Post reclamation land <br />use(s) and locations: S e e p l a n <br />2. Reclamation techniques: Con u r r P n t with m i n i n g <br />A. NRCS recommendations: <br />1) planttypes: dry land alfalfa smooth brome grass, intermediate wheat <br />2) planting schedule: w1bthina 30 days of final grading grass <br />3) topsoil cover. 611-811 <br />4) weed control: see 1 a n <br />B. Colo. Div. Of Minerals and Geology (CDMG) requirements: <br />1) amount of bonding: to be determined <br />2) timing of permit process: January 2011 <br />3) weed control: see plan <br />C. Phasing/timing: on going and co---Tree ` with mining - <br />D. Topsoil replacement see reclamation p l a n <br />1) Total amount stripped: 12,000 c u. yards <br />2) Total amount required for reclamation: 12,000 cu-. y a r d s <br />3) Total amount available for sale: 0 <br />or <br />4) Required to be imported to complete recia vdion: 0-- <br />3. Landscape plan including plant materials: T o b e reseeded per reclamation plan . <br />4. Weed control plan per Weed Control Act of 2403: See plan <br />Vicinity/Environrnental Considerations: <br />1. Slope of site: 1% to 3% <br />2. Vegetative cover. Wheat fie 1 d <br />3. Nearest river, creeks, drainages, lakes, etc 1/ 4 m i l e t o Y a m n a R i v e r - <br />4. Rights for water to use during mining: N o n e r e u i r e d <br />5. Water atrgmrntation plan if pond or lake reclamation: N/A <br />6. Affected irrigation ditches and/or structures N A <br />5
The URL can be used to link to this page
Your browser does not support the video tag.