Laserfiche WebLink
I <br />Routt County Planning Dept. <br />OPERATIONS PLAN <br />Mining Plan: <br />Mineral Development Application Form <br />Phasing plan: See mine plan ma <br />1. Estimated amount of topsoil to be stripped: 12 , 0 0 0 cu yards <br />By Phase: a. Maximum Depth: 12 " <br />b. Average Depth: 6 " t o 9 " <br />c. Total Yardage: n n 0 r11 y a r r is <br />2. Estimated amount of overburden to be stripped: 4 8 , 0 0 0 cu yards <br />By Phase: a. Maximum Depth: 6' <br />b. Average Depth: 2 ' to 4 ' <br />c. Total Yardage: 4 8, 0 0 0 c u y a r Is <br />3. Maximum amount of product to be stockpiled at anyone time: 15,000 to 20,000 icyards <br />4. Maximum area to be disturbed at any one time including stripping, stockpiles, processing, roads, etc.: <br />8 acres <br />5. Method of extraction: Loader, <br />6. Months of operation during each year. 12 <br />7. Hours of operation: 7 AM - 7 PM <br />a. Extraction: 7 AM - 7 <br />b. Maintenance: 7 Am - 7 PM <br />c. Batch plant(s): <br />d. Pumping: <br />e. Blasting: Tg /A <br />8. Number of employees, job responsibilities and workshifts: 4/ Ext r a r t i n n F,. Maintenance <br />9. Blasting: N/A <br />a. Location of blasting areas: N/A <br />b. Frequency of blasting: N A <br />c. Location of hazardous materials storage: -N ' A- <br />10. Outdoor storage: <br />11. Air pollution potential from equipment, road and site and proposed controls: Ma n" f a r t- ur e s _ s p e c s / <br />Water road for dust control <br />12. Water pollution potential from equipment and site and proposed controls: s i m i t e d d 1l o -F^ c a t i o n <br />13. Noise abatement Site orentation and elevat' <br />4