Laserfiche WebLink
<br />BREEZE BASIN RESOURCE' S, INC. <br />P.O. BOX 181 <br />HAYDEN, CO 81639 <br />PHONE #: 9710-276-3602 -KURT <br />970-326-8689 - RICK <br />FAX #: 970-824-2840 <br />FRENTRESS PIT RECLAMATION PLAN <br />EXIBIT D <br />Reclamation will be ongoing and concurrent with mining. <br />Overburden will be replaced at a maximum depth of 23' on the mined slope and covered with a <br />minimum of 6-8' of topsoil. <br />Maximum gradient of reclaimed slopes will be 3:1. <br />Fertilization and reseeding will be preformed per the NRCS Reclamation Plan. Reseeding will <br />be done within 30 days after the seed bed preparation is complete. The grass seed will be <br />drilled. <br />The existing access road to the mine will remain after the reclamation of the pit and the existing <br />sediment basin will also remain. <br />Any waste rock encountered in the mining process will be used at various locations on the <br />Frentress Ranch for erosion control. <br />The mined area will be fenced and returned to pastureland use. <br />Estimated cost for reclamation are as follows: <br />Placement of 48,000 cu. yd. of overburden at $35 per cu. yd. = $16,800.00 <br />Placement of 12,000 cu. yd. of topsoil at $.50 per cu. yd. = $6,000 <br />Fertilizer cost per acre - 9 acres X $80.00 = $720.00 <br />Seed cost per acre - 9 acres X $40.00 = $360.00 <br />Additional fuel cost for preparing seed bed, applying fertilizer and seed planting = $2,120.00 <br />Total Cost = $26,000.00