My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-02-15_REVISION - C1980004 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980004
>
2011-02-15_REVISION - C1980004 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:31:02 PM
Creation date
3/7/2011 2:06:12 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980004
IBM Index Class Name
Revision
Doc Date
2/15/2011
Doc Name
Preliminary Adequacy Review
From
DRMS
To
McClane Canyon Mining, LLC
Type & Sequence
PR2
Email Name
MPB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Corey Heaps <br />McCIane Canyon Mining, LLC <br />February 15, 2011 page 12 <br />Rules 2.05.3 (8) and 4.10 —Coal Mine Waste and Non -Coal Processina Waste <br />52. The first two paragraphs on page 2.05 -30 indicate that, initially, topsoil and cover material will <br />be salvaged from about half of the proposed CMWP footprint. Please describe which portion <br />of the footprint will be developed first, and delineate that area on Figure 2.2 -2. <br />53. The second paragraph on page 2.05 -30 says that cover material will be salvaged to a depth of 6 <br />to 8 feet. Please revise Section A -A' on Figure 2.2 -2 to depict the proposed limits of cover <br />material salvage beneath the original ground surface. <br />54. Due to the size of the proposed CMWP, and the presence of the potential man -made fill <br />beneath, please provide an additional cross section of the pile (on Figure 2.2 -2) that is oriented <br />approximately perpendicular to Section A -A'. <br />Appendix R — Stability Evaluation of Proposed Waste Pile by Buckhorn Geotech (Sep -2010) <br />55. A similar stability evaluation (study) was conducted by Buckhorn in 2007, and was <br />incorporated into the permit (as Appendix R) with TR -16. TR -16 approved the development of <br />a smaller Coal Mine Waste Pile (CMWP) adjacent to McClane Canyon. For the 2007 study, <br />five boreholes were drilled within the footprint of the proposed CMWP; a sixth borehole was <br />drilled 650' to the southwest, and finished as a monitoring well. <br />56. It is not clear from the current PR -02 submittal whether Buckhorn's 2010 study is intended to <br />replace the 2007 version, or whether the new report is provided as a supplement. Some <br />portions of the earlier study have been reiterated in the current submittal, while others are <br />missing entirely. Please clarify the intent (to replace or to supplement the 2007 version) of the <br />2010 report, and revise its contents accordingly. <br />57. Table of Contents <br />a. Exhibit A, as provided, is a CMWP plan, not Vicinity Map. Please revise the TOC <br />reference or add a vicinity map to the exhibits and rename the CMWP plan. <br />b. Appendix A — Laboratory Index Test Results — the results are not provided (but are <br />available in 2007 study). Please provide them here, or reference the 2007 study. <br />C. Appendixes C, C.1,.C.2, and C.3 are not provided. Please provide these sections of the <br />study for review and inclusion in the application. <br />d. Borehole #6 drill log and GW -9 data are provided with the report, but are not referenced <br />in the TOC. Please reference these two items. <br />58. Section 1.0 — Introduction <br />
The URL can be used to link to this page
Your browser does not support the video tag.