Laserfiche WebLink
Corey Heaps <br />McClane Canyon Mining, LLC <br />February 15, 2011 <br />Rule 2.05.3 Operation Plan — Permit Area <br />Page 10 <br />5. The first paragraph of subsection 2.05.3(2) provides a list of proposed surface disturbances. <br />The first occurrence of "4)" should be "3) ". Please revise the numbering. <br />Rules 2.05.3(3 and 4.03 Roads <br />36. Haul Roads are described beginning on page 2.05 -14 of the permit application. The second <br />paragraph on page 2.05 -14 indicates that a typical haul road section is presented on Figure 2.2- <br />5. The map referenced, as submitted with the application, does not provide a typical section. <br />Please provide a typical section for the haul road(s) and modify the reference on page 2.0514 <br />accordingly. <br />37. On Figure 2.2 -5, the naming of the haul roads is inconsistent with the application text. Please <br />rename the Portal Haul Road "Haul Road #1" and the Gob Pile Haul Road "Haul Road #2 ". <br />38 Figure 2.2 -5 provides cross sections for three specific stations for Haul Road #1. Please revise <br />this map to also include cross sections for Haul Road #2 at approximate stations 6 +00, 13 +50 <br />and 21 +00. <br />39. Access Road #1 is described at the top of page 2.05 -18. The description includes length and <br />grade, but the width is not given. Please revise the description to give the width of proposed <br />Access Road #1. <br />40. No plans and drawings specific to Access Road #1 have been submitted, as required by <br />2.05.2(3)(c)(vii). Please provide plan and profile information for the access road which <br />demonstrates that the design criteria of 4.03.2 have been met. <br />41. Page 2.05 -16 describes the Design and Construction of roads on the site. The third paragraph <br />of the section addresses embankment specifications for road sections not within the disturbed <br />area in accordance with Rule 4.05.2(4). Please provide a description of (or illustrate <br />graphically on Figure 2.2 -5 Haul Road Plan and Profile) the specific road segments to which <br />these specifications will be applied. <br />Rule 2.05.3 (4) Ponds impoundments and Diversions <br />42. Paragraph (ii)(B) on page 2.05 -21 references Rule 4.05.6(11):a. This reference appears to be in <br />error. The Division believes that the intended reference may be Rule 4.05.9(7). Please review, <br />and revise as necessary. <br />43. Rule 4.05.9(7)(d) requires that the minimum elevation of the top of the settled embankment be <br />1.0 foot above the water surface in the pond with the emergency spillway flowing at design <br />depth. Please revise the third paragraph on page 2.05 -22 to include the specific language of <br />(7)(d). <br />