Laserfiche WebLink
Colowyo C1981-019 2 March 2, 2011 <br />Rule 4.06 Topsoil <br />2. Please show on a map the topsoil replacement depths. (JHB) <br />Janet clarified that general ranges would be appropriate; Shallow, Variable, Deep. <br />Matt thought that Map 46 would be an acceptable place to add that information. <br />Rule 2.05.4(2)(b) Reclamation Cost Estimate <br />CCC has not yet submitted an RCE for the Collom expansion. This item ties in with <br />current permitting actions of TR81 & TR85. CCC indicated that they will submit a <br />RCE to us for PR3. <br />At this point in the meeting the discussions shifted away from direct questions regarding the PR3, <br />February 25, 2011, adequacy letter.