Laserfiche WebLink
U. S. DEPT. OF THE INTERIOR <br />OFFICE OF SURFACE MINING <br />Mine Site Evaluation State Program <br />Perniittee/ SENECA COAL CO. Permit C-057-82 Field Visit 09/21/2010 Continuation Page <br />Parenn Number Date <br />28. Performance Standard Categories <br />Codes: ]=Compliance, 2=Noncompliance, 3=Not Planned, 4=Not Started, 5=Noncompliance Identified Elsewhere, 6=Previously Cited <br />A. <br />B. <br />C. <br />A. <br />B. <br />C. <br />Administrative D. <br />1. _ Mining within Valid Permit <br />2. _ Mining within Bonded Area <br />3. _ Terms & Conditions of Permit <br />4. _ Liability Insurance <br />5. _ Ownership and Control <br />6. _ Temporary Cessation <br />7. _ AML Rec. Fees -- Non-Respondent <br />8. _ AML Rec. Fees -- Failure to Pay E. <br />Hydrologic Balance <br />1. 1 Drainage Control <br />2. Inspections & Certifications <br />3. 1 Siltation Structures <br />4. 1 Discharge Structures F. <br />5. Diversions <br />6. Effluent Limits <br />7. Ground Water Monitoring <br />8._ Surface Water Monitoring <br />9. - Drainage -- Acid-Toxic Materials <br />10. - Impoundments <br />11. Stream Buffer Zones G. <br />Topsoil & Subsoil <br />1._ Removal <br />2. Substitute Materials <br />3. Storage and Protection <br />4. 1 Redistribution <br />Backfilling & Grading <br />1._ Exposed Openings <br />2. Contemporaneous Reclamation <br />3. 1 Approximate Original Contour <br />4. 1 Highwall Elimination <br />5. 1 Steep Slopes (includes downslope) <br />6. Handling of Acid & Toxic Material: <br />7. Stabilization (rills and gullies) <br />Excess Spoil Disposal <br />1. 1 Placement <br />2. 1 Drainage Control <br />3. 1 Surface Stabilization <br />4. - Inspections & Certifications <br />Coal Mine Waste <br />(Refuse Piles/Impoundments) <br />1._ Drainage Control <br />2. Surface Stabilization <br />3. Placement G <br />4. Inspections and Certifications Pe <br />5. 3 Impounding Structures Ca <br />Use Of Explosives <br />1._ Blaster Certification <br />2. Distance Prohibitions <br />3. Blast Survey/Schedule <br />4. Warnings & Records <br />5. Control of Adverse Effects <br />Performance Standard Catagories <br />30 CFR Counterpart <br />Administrative .................................... ..................................... <br />1. Valid Permit ...................................................... ...............................773.11 <br />2. Mining within Bonded Area .................... ............................773.11 <br />3. Terms & Conditions of Permit .................. ...........................773.17 <br />4. Liability Insurance .................................... ............................800.60 <br />5. Ownership and Control ............................. ..........................778.13 <br />6. Temporary Cessation ..............................842.11(e) & 816/817.131 <br />7. AML Rec. Fees -- Non-Respondant .......... ......................870.15(b) <br />8. AML Rec. Fees -- Failure to Pay .............. .......................870.15(a) <br />Hydrologic Balance ............................. ....:....(816/817.41-57) <br />1. Drainage Control ..................................... ......................:............45 <br />2. Inspections & Certifications ..................... ........................49(a)(10) <br />3. Siltation Structures ................................... ...................................46 <br />4. Discharge Structures ................................ ...................................47 <br />5. Diversions ................................................ ...................................43 <br />6. Effluent Limits ......................................... ...................................42 <br />7. Ground Water Monitoring ........................ ..............................41(c) <br />8. Surface Water Monitoring ....................... ...............................41(e) <br />9. Drainage--Acid - Toxic Materials ............ ...............................41(f) <br />10. Impoundments ......................................... ...................................49 <br />11. Stream Buffer Zones ................................ ...................................57 <br />Topsoil & Subsoil ................................ ...............(816/817.22) <br />1. Removal ................................................... ...............................22(a) <br />2. Substitute Materials .................................. ...............................22(c) <br />3. Storage and Protection .............................. ...............................22(c) <br />4. Redistribution ........................................... ...............................22(d) <br />E. <br />1. <br />2. <br />3. <br />4. <br />F. <br />1. <br />2. <br />3. <br />4. <br />5. <br />G. <br />1. <br />2. <br />3. <br />4. <br />5. <br />H. <br />I. <br />1. <br />2. <br />3. <br />4. <br />5. <br />J. <br />1 <br />2 <br />D. Backfilling & Grading ..............................(816/817.95-107) K <br />1. Exposed Openings .....................816/817.13, 14, 15, & 823.11 & 21 L <br />2. Contemporaneous Reclamation ..................................................100 <br />3. Approximate Original Contour ..........................................102(a)(1) <br />4. Highwall Elimination .........................................................102(a)(2) <br />5. Steep Slopes (includes downslope) ............................................107 M. <br />6. Handling of Acid & Toxic Materials ......................................102(c) <br />7. Stabilization (rills and gullies) ..................................................95(b) <br />December 4. 1998 Page 2 of - <br />H. 3 Subsidence Control Plan <br />1. Roads <br />1. Road Construction <br />2. Certification <br />3. 1 Drainage <br />4. Surfacing and Maintenance <br />5. 1 Reclamation <br />J. Signs & Markers <br />1. Signs <br />2. - <br />Markers <br />K. _Distance Prohibitions <br />L. R evegetation <br />1. Vegetative Cover <br />2. _ <br />Timing <br />M. 1 Postmining Land Use <br />N. Other <br />eneraf <br />brmance <br />tagory <br />M _ <br />I)Phase I Bond Release <br />-2). <br />-3), <br />Excess Spoil Disposal ...........................................(816/817.71-74) <br />Placement ...................................................... .....................................71(e) <br />Drainage Control .......................................... ......................................71(f) <br />Surface Stabilization ..................................... ......................................71(g) <br />Inspections & Certifications .......................... .....................................71(h) <br />Coal Mine Waste (Refuse Piles/Impoundm ents) .....(816/817.81-84) <br />Drainage Control .......................................... ................................... 83(a) <br />Surface Stabilization ..................................... .....................................83(b) <br />Placement ...................................................... ...................................:.83 (c) <br />Inspections and Certifications ....................... ....................................83(d) <br />Impounding Structures .................................. .........................................84 <br />Use of Explosives .................................. ................(816/817.61-68) <br />Blaster Certification ...................................:.. .....................................61(c) <br />Distance Prohibitions .................................... .....................................61(d) <br />Blast Survey/Schedule ................................... ....................................62-64 <br />Warnings & Records .................................... ..................................66 & 68 <br />Control of Adverse Effects ........................... ..........................................67 <br />Subsidence Control Plan .........................................(817.121-122). <br />Roads ................................................................. (816/817.150-151) <br />Road Construction ........................................ ...................................150(c) <br />Certification .................................................. ....................................151(a) <br />Drainage ........................................................ .......................150(b)-151(d) <br />Surfacing and Maintenance ........................... .......................150(e)-151(d) <br />Reclamation .................................................. ....................................150(f) <br />Signs & Markers ................................. ......................(816/817.11) <br />Signs ............................................................. ........................1 l (a),(b),&(c) <br />Markers ......................................................... .............11(a),(b),(d),(e),&(f <br />Distance Prohibitions .......................... .............................(761.11) <br />Revegetation .....................................................(816/817.111-116) <br />Vegetative Cover .......................................... .............................1.11 & 116 <br />Timing .......................................................... ...................... ................113 <br />Postmining Land Use .......................... .................... (816/817.133)