My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-10-20_INSPECTION - C1982057 (2)
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1982057
>
2010-10-20_INSPECTION - C1982057 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:26:02 PM
Creation date
3/2/2011 9:33:01 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
INSPECTION
Doc Date
10/20/2010
Doc Name
OSM Inspection Report
From
OSM
To
DRMS
Inspection Date
9/21/2010
Email Name
SLB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U. S. DEPT. OF THE INTERIOR <br />OfFICE OF SURFACE MINING <br />Alline Site Evaluation <br />State Program <br />'U <br />1. Permince/Person 9. Permit Number 10. Permit Type <br /> SENECA COAL CO. C-057-82 PP <br /> 2. Address 11 . Field Visit Date 12. Purpose 13. SRA Present <br /> PO BOX 670 09/21/2010 OB1 }' <br />3. Citv 4. State mm - dd - yyyy <br /> <br />CO <br />HAYDEN 14. Permit Status 15. Site Status 16. Facility Type <br /> IN MC ADG <br />I :1 <br />5. Zip Code 6. Phone Number <br /> 17. OSM Office # 18. CCID # 19. Land Code <br />81639- (970) 276-5106 140 SF <br />7. Operator Name, if Different than Permittee <br /> 20. M.S.H.A ID # 21. State Abrev. 22. Count) Name <br /> <br /> 1 <br />05 <br />00304 <br />ROUTT <br />Mine Name <br />8 - CO <br /> . <br /> 23. AVS Permittee Entity ID Number 24. State Office <br />SENI?CA #II-W <br /> 1 084730 <br />25. Hours 26. Sia ature Block 27. Revie <br />Official: <br />wincy <br />2.0 a. Permit Review ? <br />e? <br />V ZN1?" <br /> <br /> <br />22 <br />0 b. Site Visit Time Signature: Signature: <br /> , CHRISTINA HULSMAN <br /> <br />10.0 c. Travel Time <br />P <br />i <br />ted Na <br />e Review Date: ?,tD e?-/ Z?°W <br /> r <br />n <br />m <br />: <br />mm - dd - yyyy <br />I I 4.6 d. Report Writing Date: 10/21/2010 Is Supplemental MSE Page Used Y/N Y? <br />Permit Type - Item 10 IP = Interim Program, PP = Permanent Program , NP = No Permit <br />Purpose Type Codes Item 12 CCR.... Citizen Complaint Referral (non site visit) <br />0xx ....Oversight RFx.... Reclamation Fees CC...... Citizen Complaint (initial site visit) <br />Axx.... Assistance Fxx..... Federal Actions CCF.... Citizen Complaint Follow-up <br />Joint Inspection - Item 13 A joint inspection is when a state inspector accompanies an OSM inspector any time during the review of the mine site. <br />Permit Status - Item 14 AB.... Abandoned: All surface and underground coal mining activities have ceased and <br />operator has left the site without completing reclamation as defined in <br />A.... Active: Coal mining and reclamation activities occurring or 30 CFR 840.11(g) <br />permitted but not yet disturbed. AB1..Bond Forfeiture: Bond forfeiture officially in process or completed, and. <br />IN.... Inactive (Permanent Program Permit): Phase II completed or reclamation in progress or not yet commenced. <br />Temporary Cessation of Operations. (Interim Program Permit) AB2..Partially Reclaimed Forfeiture: Forfeited site where all bonds have been <br />Coal mining completed and reclamation activities initiated. used to reclaim site, but site not reclaimed to Program standards. <br />BR.•.Bond Release: Reclamation completed and State Regulatory AB3..Reclaimed Forfeiture: Forfeited site that has been reclaimed to Program standards. <br />Authority (RA) has released all ofthe bond (Phase III Release.) NA...Not Applicable: When site is unpermitted. <br />Site Status Codes - Item 15 NS.. Non-Site Visit: Status of site not determined. <br />ND...No Disturbance: No coal mining and reclamation MC..Mining Complete: No mining activity on site, FP.. Forfeiture Pending: The RA is pursuing <br />operations have been started. site regraded and awaiting phase bond release. actions to revoke the permit, collect the <br />EX..Coal Exploration: Coal exploration operations TC..Temporary Cessation: The RA has granted performance bond(s), and/or reclama- <br />h <br />t <br />d <br />t <br />ti <br />f <br />i <br />i <br />ave s <br />arte <br />and where coal mining opera <br />ions cessa <br />on o <br />m <br />n <br />ng pursuant to 30 CFR 816/ tion of forfeited site is in progress. <br />have not begun. 817.131(b). FR.. Forfeited and Reclaimed: Forfeiture <br />l P <br />i <br />C <br />i <br />P <br />R <br />Ph <br />AP.. Act <br />ve <br />oa <br />roducing: Coal surface min <br />ng <br />I... <br />ase I <br />elease: At least Phase I bond release reclamation completed. <br />activities are occurring. granted for entire permitted area. For interim FO..Abandoned Site: Abandoned site that <br />AN.. Active Non-Producing: Active non-producing permits, partial bond release. is permitted but there is no bond. <br />facility such as tipple or preparation plant. P2.. Phase II Release: At least Phase 11 bond release WC.y1/ildcat: Coal mining and reclamation <br />NM..No Mining: The Permit Status is active, site is for the entire permitted area. operations have or are taking place and <br />not in Temporary Cessation, no surface coal P3.. Phase III Release: Reclamation completed and the activity is not covered by the <br />mining activity, and site not regraded. the RA has released all bond. required permits from the RA. <br />Facility Type Codes - Item 16 D...Ancillary (Haulroad, Conveyor, and/or Rails) H...Exploration Permits L... Remining site permitted <br />A... Surface E... Refuse and/or Impoundment I... Notice of Intent to Explore under 30 CFR785.25 <br />B... Underground F... Loadingg Facility and/or Tipple J... Exempt 16 and 213 <br />C... Preparation Plant G...Stockpiles K...Government Financed Construction Exemption <br />Small Business Regulatory Enforcement Fairness Act (SBREFA) <br />Your Comments Are Important <br />The Small Business and Agriculture Regulator, Enforcement Ombudsman and 10 Regional Fairness Boards were established to receive comments from <br />small businesses about Federal agency enforcement actions. The Ombudsman will annually evaluate the enforcement activities and rate each aeencv's <br />responsiveness to small business. If you are a small business (a business with 500 or fewer employees including those of affiliates) page l of <br />F <br />and wish to comment on the enforcement or compliance activities of OSM, call 1-888-UG-FAIR (1-888-734-3247). <br />Revised December 4, 1998 <br />
The URL can be used to link to this page
Your browser does not support the video tag.