Laserfiche WebLink
Agency or organization name : DRMS <br />Permit or other job action : Final Reclamation Cost Estimate - MD-05 <br />Task description :Spread topsoil over 1.2 acre MWP Pad <br />HOURLY EQUIPMENT COST <br /> Basic machine : Cat D7R DS Series 11 - 7SU Horsepower: <br />240 <br /> Blade type : Semi-Universal -- <br /> Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br /> Attachment no. 2 :NA - <br /> Data sou rce : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $43.55 NA <br /> Operating cost/hour: $64.95 100 <br /> Ripper op. cost/hour : $0.00 NA <br /> Operator cost/hour : $38.54 NA <br /> Total unit cost/hour : $147.04 Total fleet cost/hour : $147.04 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 1,452 LCY factor : NA volume : 1,452 LCY <br />Source of estimated volume :Plan Submitted <br />Source of estimated swell factor : NA -- ---- <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> <br />Average push distance : Operator skill : <br />100 feet Material consistency : 0.75 <br />1 <br />20 (avg.) <br /> <br />Unadjusted hourly production : <br />714.3 LCY/hr Dozing method:__ . <br />1.00 (Cat HB) <br /> <br />(gen.) <br /> <br />Material consistency description : Visibility : 1.00 (avg.) -- <br /> <br />Loose stockpile Job efficiency : 0.83 (1shift/day) <br /> Spoil pile: 0.80 (fnd-rf) <br /> Push gradient : 1.05 (Cat HB) <br />Average push gradient : 2.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,900 -feet Material weight : 1.44 _ (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 1,600 Ibs/LCY Net correction : 0.90 <br />Weight description : - <br />Top Soil- Adjusted unit production : 641.79 LCY/hr <br /> Adjusted fleet production : 641.79 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 2.26 Hours <br />Unit cost : $0.229 /LCY Total job cost : $333