Laserfiche WebLink
Agency or organization name: DRMS <br />Permit or other job action :Final Reclamation Cost Estimate - MD-05 <br />Task description : Spread topsoil over 2.9 acre TM Pad <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D7R DS Series 11 - 7SU Horsepower : 240 <br />Blade type : Semi-Universal <br />Attachment no. 1 : BOPS Cab Shiftbasis : 1 per day <br />Attachment no. 2 :NA <br /> Data source : (CRG) <br /> Utilization % _ <br />Cost Breakdown : Ownership cost/hour : $43.55 NA <br />Operating cost/hour : $64.95 100 <br />Ripper op. cost/hour : $0.00 NA <br />Operator cost/hour : $38.54 NA <br />Total unit cost/hour : $147.04 Total fleet cost/hour : $147.04 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume 3,428 LCY factor : NA volume : 3,428 LCY <br />Source of estimated volume: Plan Submitted <br />Source of estimated swell factor : NA --- - <br />HOURLY PRODUCTION Job Condition Correction Factors Sourc <br />Average push distance 125 feet <br />Unadjusted hourly production : 600.0 LCY/hr <br />Material consistency description <br />Loose stockpile <br />Material weight <br />Weight description <br />Top Soil <br />Average push gradient : 2.00 % (neg) <br />Average site altitude : 6,900 feet <br />1,600 Ibs/LCY <br /> <br />Operator skill : <br />0.75 e <br />(avg.) <br />Material consistency : 1.20 _ (Cat HB) <br />Dozing method : 1.00 (gen.) <br />Visibility : 1.00 (avg.) <br />Job efficiency : 0.83 _ <br />(1shift/day) <br />Spoil pile (fnd-rf) <br />Push gradient 1.05 (Cat HB) <br />Altitude 1.00 (Cat HB) <br />Material weight 1.44 (Cat HB) <br />Blade type : 1.00 (S/SU/U) <br />Net correction : 0.90 <br />Adjusted unit production : 539.10 LCY/hr <br />Adjusted fleet production : 539.10 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 6.36 Hours <br />Unit cost : $0.273 /LCY Total job cost : $935